  • July 29 · 5 min

    Ep.1656 - How to Start a Construction Project Strong and Avoid Early Delays

    In this episode, Jason continues the IPCS series by explaining how teams can prepare to start a construction project strong. He covers the critical work that must happen before and after the notice to proceed, including mobilization, permits, temporary utilities, trade partner preparation, staffing, safety, and spatial planning. Without this preparation, teams can lose weeks immediately and spend the rest of the project trying to recover time that may never be regained. What you'll learn in this episode: Why teams must prepare during the 90 days before and after the notice to proceed. How temporary utilities, permits, trailers, and mobilization affect the project start. Why trade partners need pre-mobilization meetings and clear installation work packages. How day-by-day spatial planning improves foundations, basements, and early concrete work. Why losing time at the beginning creates delays that are difficult to recover later. Are you preparing your project to start with stability, or allowing the first weeks to become a series of preventable surprises? If you like the Elevate Construction podcast, please subscribe for free and you'll never miss an episode. And if you really like the Elevate Construction podcast, I'd appreciate you telling a friend (Maybe even two 😊). Also, here are links to our YouTube Channels: · Jason Schroeder YouTube Channel: https://www.youtube.com/channel/UC4xpRYvrW5Op5Ckxs4vDGDg · LeanTakt YouTube Channel: https://www.youtube.com/c/leanTakt · LeanSuper YouTube Channel: https://www.youtube.com/channel/UCzQDevqQP19L4LePuqma3Fg/featured · LeanSurvey YouTube Channel: https://www.youtube.com/channel/UC-Ztn3okFhyB_3p5nmMKnsw

  • July 29 · 6 min

    Ep.1655 - Why Builders Must Be Involved During Design Development

    In this episode, Jason continues the IPCS series by explaining why superintendents and project managers must be actively involved during design development. Builders need time to update the production plan, logistics, zone maps, procurement log, risk register, mobilization strategy, and temporary utility plans before construction begins. Without their early involvement, the project is likely to start without a stable team, an achievable plan, or the preparation needed to execute smoothly. What you'll learn in this episode: Why builders should be engaged by the middle of design development. How early planning improves logistics, procurement, mobilization, and system selection. Why underground utilities, temporary services, permits, and site preparation must be addressed early. How builder involvement supports constructability, prefabrication, and an achievable budget and schedule. Why delaying the project team's involvement can cost weeks or months during mobilization and foundations. Are your builders shaping the project before construction begins, or inheriting an incomplete plan when it is already too late? If you like the Elevate Construction podcast, please subscribe for free and you'll never miss an episode. And if you really like the Elevate Construction podcast, I'd appreciate you telling a friend (Maybe even two 😊). Also, here are links to our YouTube Channels: · Jason Schroeder YouTube Channel: https://www.youtube.com/channel/UC4xpRYvrW5Op5Ckxs4vDGDg · LeanTakt YouTube Channel: https://www.youtube.com/c/leanTakt · LeanSuper YouTube Channel: https://www.youtube.com/channel/UCzQDevqQP19L4LePuqma3Fg/featured · LeanSurvey YouTube Channel: https://www.youtube.com/channel/UC-Ztn3okFhyB_3p5nmMKnsw

  • July 29 · 6 min

    Ep.1654 - How to Enable Designers for Better Construction Outcomes

    In this episode, Jason continues the IPCS series by explaining why project teams must actively support and enable designers throughout pre-construction. He covers real-time budgeting and scheduling, integrated models, design-assist trade partners, constructability reviews, and coordinated communication systems. When designers are left to work in isolation, projects are more likely to miss milestones, exceed the budget, create installation problems, and disappoint both the owner and the facilities team. What you'll learn in this episode: Why designers need active support from builders during pre-construction. How real-time budgeting and Takt planning improve design decisions. Why constructability reviews must examine real building systems and installation needs. How integrated models, meetings, communication, and stakeholders improve coordination. Why treating designers as partners helps projects finish on time and on budget. Are you giving designers the information and support they need, or leaving them to solve the project alone? If you like the Elevate Construction podcast, please subscribe for free and you'll never miss an episode. And if you really like the Elevate Construction podcast, I'd appreciate you telling a friend (Maybe even two 😊). Also, here are links to our YouTube Channels: · Jason Schroeder YouTube Channel: https://www.youtube.com/channel/UC4xpRYvrW5Op5Ckxs4vDGDg · LeanTakt YouTube Channel: https://www.youtube.com/c/leanTakt · LeanSuper YouTube Channel: https://www.youtube.com/channel/UCzQDevqQP19L4LePuqma3Fg/featured · LeanSurvey YouTube Channel: https://www.youtube.com/channel/UC-Ztn3okFhyB_3p5nmMKnsw

  • July 29 · 8 min

    Ep.1653 - Why Construction Teams Must Set Targets Before Design Begins

    In this episode, Jason continues the IPCS series by explaining why construction teams must build the design team and set clear targets early in pre-construction. He covers the importance of defining success, organizing communication, integrating designers and builders, creating a macro-level Takt plan, and working backward from construction milestones. Without this phase, design teams are more likely to miss deadlines, exceed the budget, ignore builder input, and deliver incomplete or unbuildable designs. What you'll learn in this episode: Why design teams need clear communication, meeting, and planning systems. How a macro-level Takt plan connects design milestones to construction needs. Why teams must design what they intend to build instead of simply building what is designed. How setting the project duration early supports a realistic budget. Why skipping target setting leads to late design, budget surprises, and false value engineering. Are you setting clear targets before design begins, or waiting until the project is over budget to make difficult cuts? If you like the Elevate Construction podcast, please subscribe for free and you'll never miss an episode. And if you really like the Elevate Construction podcast, I'd appreciate you telling a friend (Maybe even two 😊). Also, here are links to our YouTube Channels: · Jason Schroeder YouTube Channel: https://www.youtube.com/channel/UC4xpRYvrW5Op5Ckxs4vDGDg · LeanTakt YouTube Channel: https://www.youtube.com/c/leanTakt · LeanSuper YouTube Channel: https://www.youtube.com/channel/UCzQDevqQP19L4LePuqma3Fg/featured · LeanSurvey YouTube Channel: https://www.youtube.com/channel/UC-Ztn3okFhyB_3p5nmMKnsw

  • July 29 · 7 min

    Ep.1652 - Why Builders Must Be Involved in Construction Proposals and Interviews

    In this episode, Jason continues the IPCS series by explaining why the project delivery team must participate in the proposal and interview process. When the builders help develop the plan, study logistics, identify risks, and communicate directly with the client, they begin the project with greater understanding, ownership, and commitment. This conversation shows why construction companies should avoid bait-and-switch staffing and return to a seller-doer model where the people making the promises are responsible for delivering them. What you'll learn in this episode: Why builders should participate in project proposals and client interviews. How early involvement improves pre-construction planning and project execution. Why changing the proposed team creates a disconnect between builders and clients. How making promises directly increases ownership, commitment, and accountability. Why the seller-doer model creates stronger customer service and project alignment. Are the people promising the project also the people responsible for delivering it? If you like the Elevate Construction podcast, please subscribe for free and you'll never miss an episode. And if you really like the Elevate Construction podcast, I'd appreciate you telling a friend (Maybe even two 😊). Also, here are links to our YouTube Channels: · Jason Schroeder YouTube Channel: https://www.youtube.com/channel/UC4xpRYvrW5Op5Ckxs4vDGDg · LeanTakt YouTube Channel: https://www.youtube.com/c/leanTakt · LeanSuper YouTube Channel: https://www.youtube.com/channel/UCzQDevqQP19L4LePuqma3Fg/featured · LeanSurvey YouTube Channel: https://www.youtube.com/channel/UC-Ztn3okFhyB_3p5nmMKnsw

  • July 18 · 9 min

    Ep.1651 - 5 External Factors That Determine Construction Project Success

    In this episode, Jason begins a new series on what happens when critical components are missing from an Integrated Production Control System. He explains how paradigms, mindsets, goals, system structure, and rules shape the way a construction project operates. When owners, designers, stakeholders, contracts, and company leaders are not aligned, even strong project teams can be forced into rushing, pushing, bureaucracy, and anti-lean behaviors. What you'll learn in this episode: Why the owner's perspective can determine how the entire project is managed. How misaligned mindsets create delays, conflict, and unstable working conditions. Why the goal of the system must prioritize people, quality, and finishing on time. How contracts, agreements, team structures, and legal requirements affect performance. Why restrictive project rules can prevent teams from implementing lean construction practices. Are you evaluating the project team's performance without first examining the system they are being asked to work within? If you like the Elevate Construction podcast, please subscribe for free and you'll never miss an episode. And if you really like the Elevate Construction podcast, I'd appreciate you telling a friend (Maybe even two 😊). Also, here are links to our YouTube Channels: · Jason Schroeder YouTube Channel: https://www.youtube.com/channel/UC4xpRYvrW5Op5Ckxs4vDGDg · LeanTakt YouTube Channel: https://www.youtube.com/c/leanTakt · LeanSuper YouTube Channel: https://www.youtube.com/channel/UCzQDevqQP19L4LePuqma3Fg/featured · LeanSurvey YouTube Channel: https://www.youtube.com/channel/UC-Ztn3okFhyB_3p5nmMKnsw

  • July 18 · 6 min

    Ep.1650 - Why Construction Foundations Fall Behind and How Better Planning Prevents It

    In this episode, Jason challenges the idea that overtime, weekend work, added crews, and late foundations are normal parts of construction. He explains how these warning signs point to failures in planning and leadership, not bad luck. By mapping the work, verifying production rates, coordinating with trade partners, and confirming readiness before work begins, teams can eliminate excuses and build foundations on time. What you'll learn in this episode: Why overtime, weekend work, and added crews signal a deeper leadership problem. How poor planning causes foundation and basement delays. Why historical production rates must guide the construction plan. How pull planning and day-by-day spatial planning improve execution. Why trade readiness, qualified foremen, and mock-ups must be confirmed before mobilization. Are you treating project delays as unavoidable, or are you willing to improve the planning that caused them? If you like the Elevate Construction podcast, please subscribe for free and you'll never miss an episode. And if you really like the Elevate Construction podcast, I'd appreciate you telling a friend (Maybe even two 😊). Also, here are links to our YouTube Channels: · Jason Schroeder YouTube Channel: https://www.youtube.com/channel/UC4xpRYvrW5Op5Ckxs4vDGDg · LeanTakt YouTube Channel: https://www.youtube.com/c/leanTakt · LeanSuper YouTube Channel: https://www.youtube.com/channel/UCzQDevqQP19L4LePuqma3Fg/featured · LeanSurvey YouTube Channel: https://www.youtube.com/channel/UC-Ztn3okFhyB_3p5nmMKnsw

  • July 18 · 10 min

    Ep.1649 - How to Start Every Construction Phase Right

    In this episode, Jason concludes the before-phase planning series by explaining how to prepare every phase for a successful start. He covers aligning procurement and logistics with phase dates, kitting materials for crews, clearing roadblocks, confirming predecessor work, and following a structured planning cadence. The goal is to ensure that people, materials, equipment, information, access, and quality requirements are 100% ready before work begins. What you'll learn in this episode: How kitting, room kitting, and prefabrication improve flow in each zone. Why logistics and procurement must align with the phase schedule. How to identify and remove roadblocks before crews begin installation. Why high-risk work packages require more detailed planning and preparation. How to use a 12-week planning cadence to reach a confident go or no-go decision. Are your phases going wrong during construction, or are they starting wrong because the work was never fully prepared? If you like the Elevate Construction podcast, please subscribe for free and you'll never miss an episode. And if you really like the Elevate Construction podcast, I'd appreciate you telling a friend (Maybe even two 😊). Also, here are links to our YouTube Channels: · Jason Schroeder YouTube Channel: https://www.youtube.com/channel/UC4xpRYvrW5Op5Ckxs4vDGDg · LeanTakt YouTube Channel: https://www.youtube.com/c/leanTakt · LeanSuper YouTube Channel: https://www.youtube.com/channel/UCzQDevqQP19L4LePuqma3Fg/featured · LeanSurvey YouTube Channel: https://www.youtube.com/channel/UC-Ztn3okFhyB_3p5nmMKnsw

  • July 16 · 19 min

    Ep.1648 - What Is Lean? Respect and Stability Come First

    In this episode, Jason explains what Lean truly means and why it must begin with respect for people and stability, not tools, waste walks, or continuous improvement. He connects these principles to history, Toyota, flow, and continuous improvement. What you'll learn in this episode: Why respect for people and stability are the foundation of every effective Lean system. How World War II logistics, cooperation, and standardization influenced modern Lean thinking. Why overburden must be removed before addressing unevenness and waste. How flow, visual systems, total participation, and continuous improvement grow from a stable foundation. Does your Lean system begin with respect and stability, or are you trying to improve an unstable system that continues to overburden people? If you like the Elevate Construction podcast, please subscribe for free and you'll never miss an episode. And if you really like the Elevate Construction podcast, I'd appreciate you telling a friend (Maybe even two 😊). Also, here are links to our YouTube Channels: · Jason Schroeder YouTube Channel: https://www.youtube.com/channel/UC4xpRYvrW5Op5Ckxs4vDGDg · LeanTakt YouTube Channel: https://www.youtube.com/c/leanTakt · LeanSuper YouTube Channel: https://www.youtube.com/channel/UCzQDevqQP19L4LePuqma3Fg/featured · LeanSurvey YouTube Channel: https://www.youtube.com/channel/UC-Ztn3okFhyB_3p5nmMKnsw

  • July 15 · 6 min

    Ep.1647 - Before Phase Planning: Build the Right Crew Before Work Begins

    In this episode, Jason continues his before-phase planning series by focusing on how to prepare, evaluate, and align trade partners before they enter the critical production phase. He explains why participation during pull planning, look-ahead planning, and preconstruction meetings is a strong indicator of how a trade or foreman will perform in the field. What you'll learn in this episode: How early participation helps identify reliable trade partners and foremen. Why visiting crews on other projects reveals how they are likely to perform on yours. How verified production rates and labor commitments support reliable phase planning. Why onboarding, workable backlog, safety planning, and quality planning must happen before critical work begins. Are you evaluating and preparing your crews before the phase starts, or waiting until production problems appear in the field? If you like the Elevate Construction podcast, please subscribe for free and you'll never miss an episode. And if you really like the Elevate Construction podcast, I'd appreciate you telling a friend (Maybe even two 😊). Also, here are links to our YouTube Channels: · Jason Schroeder YouTube Channel: https://www.youtube.com/channel/UC4xpRYvrW5Op5Ckxs4vDGDg · LeanTakt YouTube Channel: https://www.youtube.com/c/leanTakt · LeanSuper YouTube Channel: https://www.youtube.com/channel/UCzQDevqQP19L4LePuqma3Fg/featured · LeanSurvey YouTube Channel: https://www.youtube.com/channel/UC-Ztn3okFhyB_3p5nmMKnsw

  • July 15 · 8 min

    Ep.1646 - Before Phase Planning: Rehearse the Work Before the First Run

    In this episode, Jason continues his before-phase planning series by explaining how teams can establish the standard and rehearse the first run before repetitive construction work begins. He explores how mock-ups, first-in-place inspections, acceptance criteria, quality checklists, and first-run studies help teams refine installation methods while mistakes are still inexpensive to correct. What you'll learn in this episode: Why mock-ups allow teams to test materials, methods, and sequences before full production begins. How first-in-place inspections create a clear physical standard for every following zone. Why conditions of satisfaction, quality checklists, and handoff criteria must be defined before installation. How first-run studies and concealed-work inspections prevent repeated defects and expensive rework. Are you rehearsing and improving the first installation before repeating it across the entire project? If you like the Elevate Construction podcast, please subscribe for free and you'll never miss an episode. And if you really like the Elevate Construction podcast, I'd appreciate you telling a friend (Maybe even two 😊). Also, here are links to our YouTube Channels: · Jason Schroeder YouTube Channel: https://www.youtube.com/channel/UC4xpRYvrW5Op5Ckxs4vDGDg · LeanTakt YouTube Channel: https://www.youtube.com/c/leanTakt · LeanSuper YouTube Channel: https://www.youtube.com/channel/UCzQDevqQP19L4LePuqma3Fg/featured · LeanSurvey YouTube Channel: https://www.youtube.com/channel/UC-Ztn3okFhyB_3p5nmMKnsw

  • July 15 · 9 min

    Ep.1645 - Before Phase Planning: Work Packages, Buffers, and Multi-Train Flow

    In this episode, Jason continues his before-phase planning series with practical strategies teams can use to prepare construction phases more effectively. He explains how work packages, zone planning, buffers, multi-train flow, crew planning, and coordinated 3D models can make installation easier, safer, and more reliable. What you'll learn in this episode: How to align construction, engineering, procurement, and installation work packages. Why zone maps, density analysis, and deliberate buffer placement improve trade flow. How multi-train planning allows crews to work at their natural production rhythms. How Build Your Lego® sheets and coordinated 3D models support reliable field installation. What can your team prepare before the next phase begins to make installation simpler and more predictable? If you like the Elevate Construction podcast, please subscribe for free and you'll never miss an episode. And if you really like the Elevate Construction podcast, I'd appreciate you telling a friend (Maybe even two 😊). Also, here are links to our YouTube Channels: · Jason Schroeder YouTube Channel: https://www.youtube.com/channel/UC4xpRYvrW5Op5Ckxs4vDGDg · LeanTakt YouTube Channel: https://www.youtube.com/c/leanTakt · LeanSuper YouTube Channel: https://www.youtube.com/channel/UCzQDevqQP19L4LePuqma3Fg/featured · LeanSurvey YouTube Channel: https://www.youtube.com/channel/UC-Ztn3okFhyB_3p5nmMKnsw

  • July 14 · 11 min

    Ep.1644 - Before Phase Planning: Stress-Test the Plan Before Crews Mobilize

    In this episode, Jason continues his before-phase planning series by sharing practical methods teams can use to test and strengthen a construction phase before fieldwork begins. He explains why every phase must be planned as a coordinated flow of trade trains moving through zones between clearly defined milestones. What you'll learn in this episode: How experienced outsiders can stress-test a phase through a fresh-eyes meeting. Why teams should assume the phase failed and work backward to identify potential causes. How to assign risk owners and mitigation strategies before problems occur. How 4D models, physical mockups, and paper sequencing reveal issues that schedules may overlook. Why simplified installation work packages make the plan clearer and more reliable for field crews. Are you validating every phase before work begins, or are you relying on crews to uncover planning problems in the field? If you like the Elevate Construction podcast, please subscribe for free and you'll never miss an episode. And if you really like the Elevate Construction podcast, I'd appreciate you telling a friend (Maybe even two 😊). Also, here are links to our YouTube Channels: · Jason Schroeder YouTube Channel: https://www.youtube.com/channel/UC4xpRYvrW5Op5Ckxs4vDGDg · LeanTakt YouTube Channel: https://www.youtube.com/c/leanTakt · LeanSuper YouTube Channel: https://www.youtube.com/channel/UCzQDevqQP19L4LePuqma3Fg/featured · LeanSurvey YouTube Channel: https://www.youtube.com/channel/UC-Ztn3okFhyB_3p5nmMKnsw

  • July 14 · 15 min

    Ep.1643 - Before Phase Planning: The Work That Makes Every Construction Phase Succeed

    In this episode, Jason introduces the concept of before phase planning, the detailed preparation that must happen long before a construction phase begins. Drawing from his analysis of a $520 million mega project, he explains why pull plans, preconstruction meetings, look-ahead planning, and supply-chain management are only the foundation of successful execution. What you'll learn in this episode: How before phase planning reduces risk before work reaches the field. Why pull planning should begin three to four months before a phase starts. How preconstruction meetings prepare trade partners for their first work zone. Why six-week look-ahead planning is essential for removing roadblocks. How weekly work plans, production buffers, and supply-chain planning support reliable handoffs. Are you only planning the construction phase itself, or are you doing the detailed work required to make that phase successful before it begins? If you like the Elevate Construction podcast, please subscribe for free and you'll never miss an episode. And if you really like the Elevate Construction podcast, I'd appreciate you telling a friend (Maybe even two 😊). Also, here are links to our YouTube Channels: · Jason Schroeder YouTube Channel: https://www.youtube.com/channel/UC4xpRYvrW5Op5Ckxs4vDGDg · LeanTakt YouTube Channel: https://www.youtube.com/c/leanTakt · LeanSuper YouTube Channel: https://www.youtube.com/channel/UCzQDevqQP19L4LePuqma3Fg/featured · LeanSurvey YouTube Channel: https://www.youtube.com/channel/UC-Ztn3okFhyB_3p5nmMKnsw

  • July 8 · 8 min

    Ep.1642 - Scaling Like the Human Body & The Nemawashi Effect

    In this episode, Jason explores fascinating parallels between the human body and scaling systems on construction projects. From DNA and cellular memory to energy and incentives, he shows how principles of biology can help us understand how teams grow, adapt, and operate efficiently. What you'll learn in this episode: How biological systems can inspire scaling and process design. Why continuous alignment and groundwork is faster than long committee decisions. The right way to implement change without slowing down operations. How to respect people while moving your project forward efficiently. Are your teams aligned before decisions are made, or are you still relying on slow committee processes? If you like the Elevate Construction podcast, please subscribe for free and you'll never miss an episode. And if you really like the Elevate Construction podcast, I'd appreciate you telling a friend (Maybe even two 😊). Also, here are links to our YouTube Channels: · Jason Schroeder YouTube Channel: https://www.youtube.com/channel/UC4xpRYvrW5Op5Ckxs4vDGDg · LeanTakt YouTube Channel: https://www.youtube.com/c/leanTakt · LeanSuper YouTube Channel: https://www.youtube.com/channel/UCzQDevqQP19L4LePuqma3Fg/featured · LeanSurvey YouTube Channel: https://www.youtube.com/channel/UC-Ztn3okFhyB_3p5nmMKnsw

  • July 8 · 8 min

    Ep.1641 - The Five Levers for Motivation on the Job Site

    In this episode, Jason breaks down the five critical levers for motivating your team in construction. Drawing on Lean principles, human psychology, and decades of field experience, he explains why standards, training, reinforcement, habits, and incentives are essential to get work done efficiently and safely. What you'll learn in this episode: Why visible standards are the foundation of motivation. How proper training transforms potential into performance. The role of reinforcement in making behaviors stick. How habits and incentives support sustainable change. Why leaders must drive work, not just set rules. Are your teams truly motivated, or are they just following instructions without engagement? If you like the Elevate Construction podcast, please subscribe for free and you'll never miss an episode. And if you really like the Elevate Construction podcast, I'd appreciate you telling a friend (Maybe even two 😊). Also, here are links to our YouTube Channels: · Jason Schroeder YouTube Channel: https://www.youtube.com/channel/UC4xpRYvrW5Op5Ckxs4vDGDg · LeanTakt YouTube Channel: https://www.youtube.com/c/leanTakt · LeanSuper YouTube Channel: https://www.youtube.com/channel/UCzQDevqQP19L4LePuqma3Fg/featured · LeanSurvey YouTube Channel: https://www.youtube.com/channel/UC-Ztn3okFhyB_3p5nmMKnsw

  • July 8 · 8 min

    Ep.1640 - Buffers, Before-Phase Planning, and the In-N-Out Analogy

    In this episode, Jason explores why buffers are critical on construction projects and how proper before-phase planning sets the stage for smooth execution. Using a humorous analogy of navigating an In-N-Out drive-thru, he explains how insufficient buffers not only disrupt workflow but also put workers under unnecessary stress. What you'll learn in this episode: The difference between waiting you pay for versus waiting you don't. Why buffers are essential for both workflow and worker safety. How before-phase planning prevents delays and maximizes flow. Key pre-planning activities to execute a phase successfully. How small adjustments upstream save massive time downstream. Are you fully leveraging before-phase planning to keep your projects flowing without unnecessary stops? If you like the Elevate Construction podcast, please subscribe for free and you'll never miss an episode. And if you really like the Elevate Construction podcast, I'd appreciate you telling a friend (Maybe even two 😊). Also, here are links to our YouTube Channels: · Jason Schroeder YouTube Channel: https://www.youtube.com/channel/UC4xpRYvrW5Op5Ckxs4vDGDg · LeanTakt YouTube Channel: https://www.youtube.com/c/leanTakt · LeanSuper YouTube Channel: https://www.youtube.com/channel/UCzQDevqQP19L4LePuqma3Fg/featured · LeanSurvey YouTube Channel: https://www.youtube.com/channel/UC-Ztn3okFhyB_3p5nmMKnsw

  • July 7 · 8 min

    Ep.1639 - Improvement and Standards: Lessons from Japan

    In this episode, Jason dives into the power of continuous improvement and standards on the job site. Using stories from his travels to Japan and lessons from Lean practices, he explains why even "simple" items like pens, bobby pins, or spoons can be improved, and how the mindset of striving for incremental gains can transform construction operations. What you'll learn in this episode: Why standards and continuous improvement go hand-in-hand. How small innovations can create massive cumulative impact. The 5G methodology for problem-solving in construction. Lessons from Japanese Lean practices applied to real-world projects. How to prevent stagnation and keep driving improvements. Are your processes truly optimized, or is there still room to push the next 200%? If you like the Elevate Construction podcast, please subscribe for free and you'll never miss an episode. And if you really like the Elevate Construction podcast, I'd appreciate you telling a friend (Maybe even two 😊). Also, here are links to our YouTube Channels: · Jason Schroeder YouTube Channel: https://www.youtube.com/channel/UC4xpRYvrW5Op5Ckxs4vDGDg · LeanTakt YouTube Channel: https://www.youtube.com/c/leanTakt · LeanSuper YouTube Channel: https://www.youtube.com/channel/UCzQDevqQP19L4LePuqma3Fg/featured · LeanSurvey YouTube Channel: https://www.youtube.com/channel/UC-Ztn3okFhyB_3p5nmMKnsw

  • July 7 · 9 min

    Ep.1638 - Promotions and the Gates of Leadership

    In this episode, Jason dives into what it really takes to promote the right people on a construction project. He explains why clean, safe, and organized job sites, combined with the ability to train and lead, are non-negotiable for anyone moving into a leadership role. What you'll learn in this episode: Why problems belong to the team, not individuals. The critical skills leaders must demonstrate before being promoted. How stagnation can derail projects and teams. The importance of ongoing growth and continuous learning. How to implement gates to ensure only capable leaders advance. Are your promotions based on true leadership skills, or just tenure and habit? If you like the Elevate Construction podcast, please subscribe for free and you'll never miss an episode. And if you really like the Elevate Construction podcast, I'd appreciate you telling a friend (Maybe even two 😊). Also, here are links to our YouTube Channels: · Jason Schroeder YouTube Channel: https://www.youtube.com/channel/UC4xpRYvrW5Op5Ckxs4vDGDg · LeanTakt YouTube Channel: https://www.youtube.com/c/leanTakt · LeanSuper YouTube Channel: https://www.youtube.com/channel/UCzQDevqQP19L4LePuqma3Fg/featured · LeanSurvey YouTube Channel: https://www.youtube.com/channel/UC-Ztn3okFhyB_3p5nmMKnsw

  • July 7 · 8 min

    Ep.1637 - When the Tables Have Turned

    In this episode, Jason dives into a thought-provoking scenario: what would happen if the expectations we place on construction crews were suddenly applied to office workers? Using the analogy of schedule buffers, financial contingency, and the Takt Production System, he explores how common field pressures, rushing, pushing, and panicking would never fly if the roles were reversed. What you'll learn in this episode: Why buffers in schedules are essential for system stability. How financial contingency and field operations are interconnected. What happens when unrealistic expectations are applied without context. The humor and lessons in turning the tables on traditional workplace assumptions. How to think critically about workflow, risk, and responsibility. Are your project expectations reasonable, or would they cause chaos if applied to an office? If you like the Elevate Construction podcast, please subscribe for free and you'll never miss an episode. And if you really like the Elevate Construction podcast, I'd appreciate you telling a friend (Maybe even two 😊). Also, here are links to our YouTube Channels: · Jason Schroeder YouTube Channel: https://www.youtube.com/channel/UC4xpRYvrW5Op5Ckxs4vDGDg · LeanTakt YouTube Channel: https://www.youtube.com/c/leanTakt · LeanSuper YouTube Channel: https://www.youtube.com/channel/UCzQDevqQP19L4LePuqma3Fg/featured · LeanSurvey YouTube Channel: https://www.youtube.com/channel/UC-Ztn3okFhyB_3p5nmMKnsw