Skip to content
Artwork for The Uptime Wind Energy Podcast
ScienceEarth SciencesTechnologyNature

The Uptime Wind Energy Podcast

Allen Hall, Rosemary Barnes, Yolanda Padron & Matthew Stead

Uptime is a renewable energy podcast focused on wind energy and energy storage technologies. Experts Allen Hall, Rosemary Barnes, Yolanda Padron, and Matthew Stead break down the latest research, tech, and policy.

Play
  • 68 episodes
  • a few times a week
  • Avg 19 min
  • English
Counted on this page — what you have heard stays on this device, so it is not something the list can be paged by.
  • Tuesday · 22 min

    Uptime’s Hottest Takes of 2026. Were We Right?

    The crew grades its 2026 predictions on Chinese turbines in Europe, GE Vernova’s lost engineering talent, the rise of wind consultants, and owners rethinking FSAs. This Thanksgiving, the crew checks which 2026 calls held up. The Uptime Wind Energy Podcast is brought to you by Weather Guard Lightning Tech, creators of the StrikeTape Ultra LPS retrofit. Subscribe to Uptime’s Substack newsletter. And check out Rosemary’s “Engineering with Rosie” Youtube channel. Have a question we can answer on the show? Email us!

  • Monday · 4 min

    Dogger Bank Delayed Again, Nordex Buys C1 Connections

    Allen covers a damaged blade at Ørsted’s Hornsea 3, more GE Vernova turbine delays at Dogger Bank, Nordex buying Dutch tower firm C1 Connections, and Ming Yang’s moves in the Philippines and Egypt. The Uptime Wind Energy Podcast is brought to you by Weather Guard Lightning Tech, creators of the StrikeTape Ultra LPS retrofit. Subscribe to Uptime’s Substack newsletter. And check out Rosemary’s “Engineering with Rosie” Youtube channel. Have a question we can answer on the show? Email us!

  • November 19 · 27 min

    Why Blade Repair Records Matter, w/ Rosemary Barnes

    Rosemary Barnes, founder of Pardalote Consulting, joins to discuss repair records, serial defects, and blade inspections before a wind farm sale. The Uptime Wind Energy Podcast is brought to you by Weather Guard Lightning Tech, creators of the StrikeTape Ultra LPS retrofit. Subscribe to Uptime’s Substack newsletter. And check out Rosemary’s “Engineering with Rosie” Youtube channel. Have a question we can answer on the show? Email us!

  • November 17 · 28 min

    Nordex Loses a Blade, Siemens Gamesa Returns to Profit

    Nordex loses a blade during testing in Latvia, Siemens Gamesa returns to profit, and Vestas orders fall 27%. Plus Ørsted earnings climb as injuries rise, and Windcatching lands €100 million. The Uptime Wind Energy Podcast is brought to you by Weather Guard Lightning Tech, creators of the StrikeTape Ultra LPS retrofit. Subscribe to Uptime’s Substack newsletter. And check out Rosemary’s “Engineering with Rosie” Youtube channel. Have a question we can answer on the show? Email us!

  • November 16 · 5 min

    Vestas Profit Misses Forecast, RWE Wind Farm Knocked Offline

    Allen covers a Vestas profit miss, RWE’s Sofia offline, a £12B Norfolk deal, Siemens Energy at Berwick Bank, and a new O&M deal. The Uptime Wind Energy Podcast is brought to you by Weather Guard Lightning Tech, creators of the StrikeTape Ultra LPS retrofit. Subscribe to Uptime’s Substack newsletter. And check out Rosemary’s “Engineering with Rosie” Youtube channel. Have a question we can answer on the show? Email us!

  • November 12 · 29 min

    What Drivetrain Failures Reveal, w/ Oskefer Consulting

    Derek Gong from Oskefer Consulting, joins to discuss drivetrain failures, OEM handoff gaps, and missed SCADA warnings. Reach out to Derek on LinkedIn. The Uptime Wind Energy Podcast is brought to you by Weather Guard Lightning Tech, creators of the StrikeTape Ultra LPS retrofit. Subscribe to Uptime’s Substack newsletter. And check out Rosemary’s “Engineering with Rosie” Youtube channel. Have a question we can answer on the show? Email us!

  • November 10 · 33 min

    1,000-Turbine Study Reveals Which Parts Fail Most

    A 1,000-turbine European reliability study finds pitch systems, controllers and power converters fail most often. Plus why failures climb in year nine and an offshore farm blind to lightning. The Uptime Wind Energy Podcast is brought to you by Weather Guard Lightning Tech, creators of the StrikeTape Ultra LPS retrofit. Subscribe to Uptime’s Substack newsletter. And check out Rosemary’s “Engineering with Rosie” Youtube channel. Have a question we can answer on the show? Email us!

  • November 9 · 3 min

    Vestas Turbine Tops 199-Meter Tower, OECD Flags China Subsidies

    Allen covers a Vestas turbine on a 199-meter hub in Bavaria, Dominion’s 44 turbines up at Coastal Virginia Offshore Wind, an OECD report on Chinese subsidies, and Nordex’s push to keep non-Western turbines out of Europe. The Uptime Wind Energy Podcast is brought to you by Weather Guard Lightning Tech, creators of the StrikeTape Ultra LPS retrofit. Subscribe to Uptime’s Substack newsletter. And check out Rosemary’s “Engineering with Rosie” Youtube channel. Have a question we can answer on the show? Email us!

  • November 5 · 31 min

    What to Know About Blade Quality, w/ Kronborg Consult

    Jacob Kronborg, founder of Kronborg Consult, joins to discuss blade factory quality, carbon pultrusion repairs, serial defects, and LEP. The Uptime Wind Energy Podcast is brought to you by Weather Guard Lightning Tech, creators of the StrikeTape Ultra LPS retrofit. Subscribe to Uptime’s Substack newsletter. And check out Rosemary’s “Engineering with Rosie” Youtube channel. Have a question we can answer on the show? Email us!

  • November 3 · 24 min

    Octopus Buys Golden Plains, Blade Defects, Hotel Pet Peeves

    Octopus Investments buys Golden Plains stage two for over A$2 billion. Plus, the blade defects new owners miss in due diligence, internal inspections, and the hosts’ conference hotel pet peeves. The Uptime Wind Energy Podcast is brought to you by Weather Guard Lightning Tech, creators of the StrikeTape Ultra LPS retrofit. Subscribe to Uptime’s Substack newsletter. And check out Rosemary’s “Engineering with Rosie” Youtube channel. Have a question we can answer on the show? Email us!

  • November 2 · 7 min

    Ming Yang Firewalls Europe, US Turbine Orders Surge

    Allen covers Ming Yang’s firewall from Beijing and Octopus Energy deal, US turbine orders hitting a three-year high, and Norway’s floating wind funding. The Uptime Wind Energy Podcast is brought to you by Weather Guard Lightning Tech, creators of the StrikeTape Ultra LPS retrofit. Subscribe to Uptime’s Substack newsletter. And check out Rosemary’s "Engineering with Rosie" Youtube channel. Have a question we can answer on the show? Email us! Episode Transcript Happy Monday everyone. A Chinese turbine maker is building a wall. Not around a factory. But around its own European business. And that wall ... is trying to blockade Beijing. The company is Ming Yang. It has set up separate companies in Europe. Separate boards. Separate computer systems. The goal is simple. Keep Beijing out. Here is why. Chinese law can require Chinese companies to help the state with intelligence work. European buyers worry about that. So does Britain. In March ... the British government said no to Ming Yang turbines in its offshore wind farms. The reason ... national security. That killed a planned factory in Scotland. One-and-a-half billion pounds. Up to fifteen hundred jobs. Now Ming Yang is trying a different door. It is teaming up with Octopus Energy to look at onshore turbines for Britain. Ming Yang builds the machine. Octopus supplies the software and the controls. Neither company will say when ... or who will own what. A Ming Yang executive says China has no access to its European business. Or to wind farm data. But he admits that separate companies are not the full answer. An energy researcher at Oxford puts it plainly. A Chinese company is very unlikely to switch off a wind farm. But the threat is always there. And the Financial Times notes ... TikTok tried the same idea. So why go to all this trouble? Price. Analysts say Chinese turbines cost thirty to forty percent less than Western ones. That price gap is now a problem for the people who write Europe's rules. Europe's energy commissioner was asked if Chinese turbines should be kept out. His answer? Ask me in a few months. He says Europe wants to trade with the world. It also wants to protect its own turbine makers. He says Europe already watched China take over the solar industry. And he draws one firm line. Nobody in another country should be able to control Europe's power plants from afar. But he admits something else. Some parts may only come from overseas. And some may be so cheap ... that buying European would sink the project. In Denmark ... that is not a theory. Vattenfall won two Danish offshore tenders in August. It will not rule out Chinese turbines. Its chief executive says it has no Chinese contracts today. Denmark's metalworkers union is not happy. It says developers praise European wind ... then go shopping in China. The commissioner's direction for now? New buying rules that make it easier to require European parts. While Europe weighs its options ... America has been racing a deadline. Federal wind tax credits end with the decade. To keep them ... developers had to start construction by July fourth. So they rushed to order turbines. Wood Mackenzie says turbine orders hit two-point-eight gigawatts in the second quarter. The most since late twenty twenty-three. Wood Mackenzie expects thirty-nine gigawatts of new onshore wind by twenty thirty. More than half of the projects through twenty twenty-eight are already running or under construction. Texas stays the biggest single state. But the West is where the growth is. Colorado. New Mexico. Wyoming. Repowering is cooling off. Wood Mackenzie cut that forecast by one gigawatt. Owners ordered less repower equipment than expected. And there is one more item that engineers should circle. Tornadoes. The American Society of Civil Engineers is updating its national design standard. It is due out at the end of next year. It is expected to add tornado design rules for wind turbines. Not everywhere. Only where tornado winds pass certain limits ... and the turbines pass certain exposure limits. But Wood Mackenzie says that covers most of the country. And it will raise costs. Finally ... Norway is paying to learn. The government agency Enova is putting nearly four billion Norwegian kroner into floating wind. There are two winners. Fortius Offshore Wind. And Fram Wind Solutions. Each gets about two billion kroner. Together ... they will put four big floating turbines at a test site off Norway's west coast. Eighteen-and-a-half megawatts each. Here is the interesting part. Enova picked the winners with one number. How much energy each krone buys. Enova's chief says the goal is to make floating wind profitable. If that works ... big floating wind farms can follow. So what should wind professionals take from this? First ... the fight over Chinese turbines is becoming a fight over control systems. Look at the Octopus deal. Chinese hardware. British software. Expect more deals built that way. Second ... the American order rush means a construction crunch is coming. Turbines ordered before July must be built before the credits run out. Crews, cranes and blades will be in short supply for the next few years. Lock in your people and equipment early. And if repowering slows ... older turbines stay in service longer. That means more inspections ... and more repairs. Third ... watch the tornado rules. A wind farm designed today may not start construction until the new rules are out. Ask your turbine supplier how its towers and foundations hold up. Before the building inspector asks you. And that is the state of the wind industry for the 2nd of November 2026. Join us for the Uptime Wind Energy Podcast tomorrow.

  • October 29 · 26 min

    How Startups Find Problems Worth Solving, w/ Teemu Vekkeli

    Teemu Vekkeli, Principal at Vekkeli Advisory, joins to discuss VC versus bootstrapping, budget cycles, and problems worth solving. Plus why trust drives sales in Japan, what site technicians know, and why every pitch eventually has to convince the CFO. The Uptime Wind Energy Podcast is brought to you by Weather Guard Lightning Tech, creators of the StrikeTape Ultra LPS retrofit. Subscribe to Uptime’s Substack newsletter. And check out Rosemary’s "Engineering with Rosie" Youtube channel. Have a question we can answer on the show? Email us! Episode Transcript Announcer: Welcome to Uptime Spotlight, shining light on wind energy's brightest innovators. This is the progress powering tomorrow.Allen Hall: Teemu, welcome to the program. Teemu Vekkeli: Well, thank you, Allen. Thanks for inviting me. Great to be here.Allen Hall: It's great to have you. And you come at a very unique time in wind, just because there's so many things happening. There have been a number of changes at large operators. I think everybody knows the names, where a number of good engineers and technical people have been let go for a variety of reasons, and now they're forming their own companies. And we see this all the time on the podcast, which is great, right? Because those are really smart people that have been in the industry a long time and have a lot to offer. They've seen where the problems are. They know where issues sit and can offer some solutions to them. And you, being a longtime wind person in the industry, you kind of see it come and go. What are you seeing on the ground on your end? You're based in Amsterdam. We're based in the United States. What are you seeing locally?Teemu Vekkeli: Yeah, for sure. A lot going on, both in terms of the majors restructuring, but I guess that's just another cycle, as far as I can see it. But yes, for sure, also a lot happening in the startup scene. Already for some years, but now especially, there's a large amount of talent in the market, and I'm sure people are looking into different options for their careers.Allen Hall: I think in today's world, there's a lot of opportunity to make a good deal of money, a lot more than you probably made working for a large operator or OEM, because of the knowledge you have in your head. And that does seem to be where a lot of people are going right now. They're forming two-person, three-person companies. They've worked together in the past and joined forces and created a company. They have a company name, they have a website up and running, and they know where problems lie, particularly on certain turbines they've worked on for a long time. So they have inside knowledge of what is happening there. My concern when they start some of these businesses, and this is where I want to get some of your advice, is how to form that company. How are they thinking about this? Are they trying to grab investor money and raise a couple hundred thousand euros or dollars to get started, or is this more of a bootstrap operation where we're living off our bank account for a while?Teemu Vekkeli: Yeah, there's definitely different approaches. A lot of the people coming out of these utilities or major players might not have the exposure to that finance and investment side. So they're thinking, okay, should I live off my life savings? Should I take out a loan? Should I live off my inheritance or whatever? So… a lot of options, but… And maybe if you're really at that startup stage, maybe VC is not the option. Like you said, it comes with a set of conditions, which may or may not be favorable to everybody.Allen Hall: Right. And if you haven't done it before, sometimes you get yourself into a little bit of a bind. It seems so easy. I give up 10% of my company today. Well, so what? I've got 90% of it. It's probably okay. Or if I have a couple of partners, maybe 20, 30% into this thing. It's not a huge thing. However, it does come with a lot of other constraints, I'll call them, that aren't relative to the percentage they own, which can really bind you up for a while, especially if you're starting.Teemu Vekkeli: Yeah, exactly. And as you scale, then that equity at some point might become restrictive. But…Allen Hall: Exactly.Teemu Vekkeli: …depends on the case.Allen Hall: Right. So the advice you're giving people now, especially in this marketplace where there is a lot of cash available. I know it doesn't seem like that's a thing right now. Because of the environment we're living in, you would think, well, there's not a lot of VC firms, not a lot of cash. Actually, for a small business or a new business, there is a lot of cash you can get your hands on relatively quickly. But you need to get some help on that, which is where you come in, because you can get offered a whole bunch of things real early. And it may make sense. It may be the right solution for a particular company, but a lot of them may want to wait a while. That's my opinion. What are your thoughts on that?Teemu Vekkeli: Yeah, exactly. So have a solid proposition first before you enter that. And I guess having access to capital is also a sort of ecosystem thing…Allen Hall: Well, that's where you come in. I think a lot of times, as a founder of companies and meeting a lot of founders of companies, that's the hard part. They don't know where to go, and they're trying to put feelers out. It's not something you can even use ChatGPT on. There's a hidden underground to this VC market and the cash, and sometimes even the technical expertise you may need to get your company up and running. It's a small industry, in a sense. There are just a few thousand people that are really qualified in that space, but they're spread all over the world. They're literally all over the world.Teemu Vekkeli: …being in this industry for the last 20 years. Yeah, there's a lot of small circles around particular topics or particular geographies. Those small circles go round and round. People go into different companies. People work with each other in different capacities. And that's also positive in a sense that you're getting exposure to the different elements of real-world operations. But as that translates into a product, and eventually scales into a company, that's where a lot of these smaller founders and entrepreneurs might need some support.Allen Hall: Yeah. And a lot of times, especially now, the people you may have known are in Singapore, maybe in Brazil, maybe in India, where the technology is or where the expertise lies. That's going to make your company really viable and give you access to some marketplaces at the same time. Those can be some really hard decisions to make versus someone you know that's real close to you but doesn't have any reach into the marketplace. It gets hard.Teemu Vekkeli: That's one aspect of it, as well as connecting to a wider market. If you're stuck in one small town somewhere, you can only do so much, right? But if you open yourself to do business worldwide, all of a sudden there are so many more opportunities.Allen Hall: Right. And we like to think local business is easy, because I can drive there or take a train to wherever my customer is, but a lot of times they're not local. Which comes with its own difficulties. If you're going to do business in India or Brazil or Europe, if you're from the United States, there's just different rules and different cultural aspects you need to pay attention to. And it's hard, especially if you're starting up a business, to try to bridge those gaps, or even to know where to think about them. For small businesses, that puts up a barrier, which is hard to overcome sometimes without some advice.Teemu Vekkeli: A lot of people may struggle with that. Again, if you're coming out of one small pond, then all of a sudden you're traveling across… to learn in that.Allen Hall: The one that always gets me is South Korea or Japan. They can be culturally very difficult for a lot of other countries to deal with and try to understand. How does this system even work? How do I approach somebody? How do I sell something in this culture without offending somebody? And all the little details you have to pay attention to are very, very real. But as a small business, you think, well, I have a solution. It's really good. I have this really nice website. They're going to buy. I don't have to do the detail work. And that's where a lot of deals fall apart, honestly, especially for a small business, over something that has nothing to do with the product.Teemu Vekkeli: Yeah. In the end, it's very much trust based as well. People buy from people, and ideally they buy from… interacted with before… that they have their substance lined up. Yeah. You speak about Japan. That's a very interesting environment. I spent more than the last seven years working for a Japanese company, so I became very familiar with that kind of business environment. Very much trust based, even more so than many others.Allen Hall: When we talk to small businesses that are starting all the time, it's like, who's helping you? You need a guide. You need somebody to hold your hand a little bit, and this is kind of where you come in. Because a lot of times that is the difference between failure in a country or success, just having the relationships.Teemu Vekkeli: Yeah. It's not about just having a contact. It's actually having established that relationship beforehand. A lot of people reach out to me asking if I could make an introduction on their behalf. But that's not necessarily the way to go. It's really finding a relevant contact with a relevant need for your product, instead of just making generic introductions. And that has to work both ways. Both the vendor and the client need to get something out of it.Allen Hall: Right. It does seem like, well, if you give me the name, I'll take care of the rest....

  • October 27 · 26 min

    Ming Yang Eyes 33 MW Turbine, Greenvolt Delays FID

    Ming Yang plans a 33 MW turbine while China pulls European tech out of its wind farms. Plus white-hat hackers reach 7.8 GW in Germany, Vårgrønn eyes a Greenvolt exit, and who really owns turbine data. The Uptime Wind Energy Podcast is brought to you by Weather Guard Lightning Tech, creators of the StrikeTape Ultra LPS retrofit. Subscribe to Uptime’s Substack newsletter. And check out Rosemary’s "Engineering with Rosie" Youtube channel. Have a question we can answer on the show? Email us! Episode Transcript Announcer: The Uptime Wind Energy Podcast, brought to you by StrikeTape, protecting thousands of wind turbines from lightning damage worldwide. Visit striketape.com. And now your hosts.Allen: Welcome to the Uptime Wind Energy Podcast. I’m Allen Hall, here with Rosemary Barnes, Matthew Stead, and Yolanda Padron. We were just discussing WOMA 2027, which is in Melbourne, March 3rd to the 5th. Registrations are coming in, and Rosemary was just scolding me about it. We have a lot of registrations in, and there are only 200 seats, so we need to be telling attendees to register now, right, Rosemary?Rosemary: Absolutely. Don’t do like I do and leave it to the last minute, because you might find yourself missing out. We’ve got a capped venue. Last year we were getting close to the maximum, but this year I think we’re going to have to cap it for sure.Allen: When we run out of seats, we run out of seats. And when you send me that nasty email saying, “Why can’t I get a seat at WOMA 2027?” I’m going to send it to Rosemary, and she’s going to call you and tell you to register early.Rosemary: We also have Direct Wind Services as the first sponsor. I’m not sure if you were aware of that.Allen: Yes. And Direct Wind Services is sponsoring Rosie’s blade course. What are we going to call that, Rosemary?Rosemary: I’m calling it A Blade Is Born.Allen: A Blade Is Born. Oh, How a Blade Is Born.Rosemary: Title TBD. Allen hates that title. That’s what we’ve actually been arguing about before the show. It covers what happens before the blade gets into the turbine and starts being the O&M team’s headache. What happens before then that you need to know about in order to do your O&M properly and make sure of everyone you’re relying on? You need some knowledge of the system to understand whether it’s believable when someone gives you a root cause analysis for a serial defect, for example. It’s all the things you need to understand about how blades are designed and certified, including testing, and then especially manufacturing.I’ve been fastidiously collecting sources from the internet that show the manufacturing process. It’s quite challenging to describe that process well, because everyone is so secretive. You’re not allowed in any factories anymore. But I put together a good package. It’s also a little bit of a taster for the longer course that Pardalote and Direct Wind Services have been putting on for blade training for asset managers and other wind energy professionals. So you can get a little bit of that for free as part of your WOMA attendance.Allen: So you can attend Rosie’s A Blade Is Born session on the Friday. But the only way you’ll be able to do that is to register, and you can register at womaaustralia.com. And you’d better do it pretty soon, otherwise you’re going to miss out.Poland Loosens Onshore Wind RulesAllen: Our first story is from PES Wind magazine, written by developer RP Global, and its question is who is best placed to build Poland’s next wave of wind. Poland loosened its siting rules in 2023, and it made some revisions to that just recently in 2026. The 2026 changes were about new grid laws, which are hopefully going to open up development.RP Global argues the winners won’t be the biggest developers, and that’s generally true worldwide. They’ll be the ones with projects that can actually get built, which is a huge problem in the United States and, evidently, in Poland. So Poland may be a really good test case for onshore wind in Europe at scale. If you haven’t seen this article, you should go to peswind.com, where you can download it and read it for yourself.Poland is one of those areas where they’re trying to do more wind. The legislation is in place, but they’ve had problems. Most recently, in 2025, they rejected something like 40 gigawatts of wind projects for not being suitable or ready to be developed. This is going to be a different approach, and we’re going to watch it happen live.Yolanda, development is one of your areas. When you’re developing wind, especially in a new location, it does seem like subject matter experts are one of the missing links, especially for Poland, which hasn’t done large-scale projects like we’re talking about now. There’s going to be a big demand for brain power in Poland, right?Yolanda: Yeah, I think they can definitely benefit from, at the very least, telecommunicating with some experts within Europe and outside of Europe. It was really interesting to see that the setback is ten times the tip height to the closest house. That’s a very big setback compared to the United States.Allen: They’re shortening those setbacks, Yolanda, so they’re making it much easier to get some projects in. I think that’s what the movement in Poland is.Yolanda: Which is really good.Allen: Yeah, that’s fantastic, right?Yolanda: Yeah. It’s great to see that they’re moving toward progress. Everybody needs more energy, and wind is a really great resource. So it’s good to see a country moving in that direction, especially when you see other countries that seem to be putting more hurdles in front of wind.Allen: Do you think they’re taking into account the lightning in Poland? My understanding is that there can be some nasty storms and lightning events.Yolanda: I’d really hope so. Like Allen mentioned, there are a lot of things they really need to take into account, because even if they’re expanding the area, it’s still a pretty confined area they can put things in. So hopefully they’re really pushing for excellence on all of these sites.Allen: That’s just going to be the key to the growth, right? Having projects that you can develop and connect to the grid. It does sound like they’re also making some rule changes so that if you haven’t complied with all the rules to connect, you can set them aside and fix them as you go along, which is a technique that’s not implemented in many other places. We’re going to have to watch this remotely and see how it goes.Over the past couple of years, we at WeatherGuard have done a little bit of watching Poland and where it’s going, and it’s been slower than we would have hoped. But that’s changing. Go check out this article by RP Global in PES Wind magazine. You can download it and read it for yourself at peswind.com.Well, that’s the news from Poland. Next, why China is pulling European technology out of its wind farms.Allen: Are you overspending on lightning repairs? Most operators are, because solving lightning damage is complicated. WeatherGuard Lightning Tech helps operators reduce lightning damage. Our innovative StrikeTape Lightning Diverter protects over 20,000 blades worldwide. Now, StrikeTape Ultra installs faster than ever. StrikeTape Ultra cures up tower in just 15 minutes, even in cold weather. Visit weatherguardwind.com to schedule a call.China Pulls European Tech From Its Wind FarmsAllen: China is pulling European technology out of its own wind farms. A Polish think tank reviewed about 1,700 Chinese procurement documents, and about 250 of those called for swapping foreign technology for Chinese gear. The focus is mainly on the digital layer: converters, chips, and control software.At the same time this is going on, Vestas is complaining about not having access to their wind turbines in China, and China is pushing bigger and bigger wind turbines. Ming Yang is said to be developing the world’s largest wind turbine, rated at up to 33 megawatts.Rosemary, it does seem like a real dichotomy is happening. Chinese manufacturers are trying to enter Europe, and in the meantime they’re ripping European components out of wind farms, and solar farms for that matter, in China. Yet they want to introduce Chinese technology into Europe. There has to be a balance here somewhere, right?Rosemary: Yeah, I don’t know. Ideally there would be a balance. But I think China is a big enough market that they can behave in a one-sided way. They make things that are way cheaper than what everybody else makes, so there are people that want to use those turbines outside of China. And I can see that it makes sense. China is a country with a really strong industrial strategy, and part of that is going to be relying less and less, and eventually not at all, on any other country’s technologies. So I can kind of understand it from China’s perspective.Allen: But when the UK wants to do the same thing, or Denmark wants to do the same thing and keep Danish wind turbines Danish, there’s a huge pushback from China. There does seem to be a bit of a problem with that.Rosemary: Yeah, for sure. It’s hypocritical, but I think everybody is pretty hypocritical in terms of their foreign trade policies. The difference is that they’re big enough to get away with it, I guess.Allen: Well, why is China interested in pulling European or American technology out of the turbines or solar farms? If you have a fully working product, say a Vestas wind turbine in China, why would you want to take out the converters?Rosemary: Maybe it’s not paranoia. I mean, everybody is pretty paranoid about data and hacking. There was a Kassel-based IT security firm, Jackaroo. They’re white-hat hackers, hacking in order to expose vulnerabilities rather than to do anything nefarious. They managed to get into one inverter brand. He managed to gain access to the administrative accounts without a valid password, with privileges including starting and stopping solar installations, controlling battery storage systems,...

  • October 26 · 5 min

    Trump Delays Turbine Tariffs, Pentagon Approves Two Projects

    Trump skips turbine tariffs, the Pentagon clears two wind farms, the DOJ targets Revolution Wind, and China pushes into Europe. The Uptime Wind Energy Podcast is brought to you by Weather Guard Lightning Tech, creators of the StrikeTape Ultra LPS retrofit. Subscribe to Uptime’s Substack newsletter. And check out Rosemary’s "Engineering with Rosie" Youtube channel. Have a question we can answer on the show? Email us! Episode transcript Happy Monday, everyone. Washington spent the week talking about national security. Of wind turbines. First… imports. This past Thursday… President Trump signed an order on foreign wind turbines. The Commerce Department says imported turbines and parts threaten national security. It gives two reasons. America depends on them. And they could be controlled from overseas… to shut down the power grid. The order names one part. The inverter. It says most inverters are made outside the country. But there are no new tariffs… for now. The Commerce Secretary and the Trade Representative will negotiate with trading partners instead. They have one hundred eighty days to report back. That puts the deadline in late April. Next… the Pentagon. About three hundred wind projects are stuck in Pentagon security reviews. On Thursday… two got through. One in Maine. One in South Dakota. The White House says more approvals are coming in the weeks ahead. Why now? Bloomberg reports the White House offered to free about thirty stalled projects. The price? Democratic votes for a Senate bill to speed up permits. But the approvals may come with strings. Some developers say the Pentagon could pull its approval later. And a permit that can be pulled is hard to finance. Senator Sheldon Whitehouse helped write the Senate bill. He calls Thursday's move a start. He wants a lot more. That same week… the Justice Department went the other way. It asked federal judges to send back the permits for three offshore wind farms. Revolution Wind… off Rhode Island. It has made power since March. New England Wind… off Massachusetts. And Maryland Offshore Wind. Government lawyers say the Biden-era approvals found harm to endangered species… and approved the projects anyway. That hit the Senate deal hard. Democrats signed on because the White House promised better treatment for wind. One part of the bill bars federal agencies from playing favorites between energy sources. Senator Whitehouse had a short answer. “This is how you blow up a permitting deal.” The Senate takes up the bill after the November elections. Finally… a view from Europe. The head of BMS Heavy Cranes says Chinese turbine makers are pushing into Europe. They are coming in through the east. Hungary. Romania. All the way up Europe's eastern edge. He says they are winning projects that Vestas does not win. So his cranes now work for Chinese customers. He admits it stings. He even bought a Chinese crane to test it. Why are the Chinese winning? Not cheap labor, he says. He toured a Chinese factory run entirely by robots. He says they win on technology. His one open question? How long the Chinese machines will last. So what does this mean for wind professionals? First… the trade fight may become a cyber fight. The Commerce Department order is about remote control… not price. Know where your controllers, converters and remote access come from. Expect regulators to ask. Second… watch the April deadline. The trade talks could end with new tariffs. If you sign turbine or parts deals this winter… decide now who pays if that happens. Third… read the favoritism language in the Senate bill. Does it cover permits already granted? Or only new ones? If only new ones… it will not help the three wind farms in court today. So Washington spent the week asking if a wind turbine could be turned against America. Europe is asking a different question. How do you compete with a factory run by robots? And that is the state of the wind industry for the 26th of October 2026. Join us for the Uptime Wind Energy Podcast tomorrow.

  • October 22 · 25 min

    Tightline and Avient Remove Peel Ply From Carbon Planks

    This week we're revisiting our discussion with Andrew Davis of Tightline Composites and Brad Schmidt of Avient, who discuss a resin additive that eliminates peel ply on carbon planks. The Uptime Wind Energy Podcast is brought to you by Weather Guard Lightning Tech, creators of the StrikeTape Ultra LPS retrofit. Subscribe to Uptime’s Substack newsletter. And check out Rosemary’s "Engineering with Rosie" Youtube channel. Have a question we can answer on the show? Email us! Episode Transcript Welcome to Uptime Spotlight, shining Light on Wind. Energy's brightest innovators. This is the progress powering tomorrow. Allen Hall: Andrew and Brad, welcome to the show. Thanks for having us. Thank you. Well, we're gonna start off by talking about carbon protrusions, because that's the focus of your technology, title IX composites, and there's been some recent advancements that are really fascinating, but I, I kind of wanna go back a minute because carbon pull protrusions are the future, even though we're still making some fiberglass blades that'll have a limited lifespan. We're gonna be moving to carbon protrusions because the strength and the weight. And the cost, simplicity of it, uh, just makes carbon protrusions the future. And Tightline Composites has been key in that mold of making these, uh, carbon planks and getting 'em out to industry. I. But one of the big problems with any sort of carbon plank product is it [00:01:00] usually has a peel ply. And Andrew, you wanna talk about what that peel ply does and why it's used and why we need it. Andrew Davis: You really need that surface energy created by removing the peel ply to, to get an effective bond as you're building your spark cap. And so for years, this has just been considered a necessary evil. Uh, in terms of creating, creating that effective bond. And, and that's, that's the world we've lived in for the last 10 years. Allen Hall: And a peel ply for those who are not deep into the composite industry. Peel, ply is a removable. Ply a fabric that's that's applied over the carbon on the outside and it's kind of thicker and it has, uh, this kind of rough and surface. So when you build the protrusion, you got these two layers of this peel ply on either side, and it travels with the product. So as, uh, tight line sends out product, these, these peel plys go with it. [00:02:00] And ideally when they get to the factory, the, the people on the floor. Pull this peel play off and it's not fun to peel off one and two, it's kind of invisible. So you can forget that it's there and install it in ablaze. And Joel, you have seen that in the field. You've seen protrusions where they have the ply still attached. Joel Saxum: Yeah, it's, it's like, um, Alan, we saw one of the other day too, where it was like there was still a coating on a down conductor, right? So like, if you. If you try to embed this product, the, the idea behind peel and the peel ply is you peel the peel ply, and now you have a prepped surface that can be chemically and mechanically bonded to easier or in, in, in, in a much better way, as designed. So if you forget to pull that off, now you have a structural element inside the PLA or inside of whatever you may be building in composites. That doesn't have the ability to bond properly to that protrusion, to that carbon plank or to that glass plank. Uh, and if that's the case, you lose, I can't [00:03:00] put a number to it. Right. But you lose an immense Andrew Davis: amount of structural strength. And Joel, just to underline your point, we've heard from customers who will remain nameless that it is, it, it happens that, that this will get caught on scan. Uh, when the blade is completely done, and then the entire blade has to be scrapped. There's no, there's no fixing it. Allen Hall: Yeah. That, that, that gets expensive. Real quick, you're talking about a hundred thousand dollars blades for onshore. Forget about offshore for a minute. An offshore blade, multi times, is that three or four? Uh, so the, the, the, the engineering is right. The protrusion is the right answer and carbon is the right answer for blades, but it's really comes down to getting. The peel ply and what, what do you wanna deal with that? 'cause the other part of the peel ply is you just create this waste cycle that peel ply gets just tossed into the garbage. It's not a recyclable thing, it's one use and it's done. So the, in the carbon protrusion world, if we can remove that peel ply, that is huge, [00:04:00]gigantic. However, it is been really hard to do that because there hasn't been any technology to remove it, and we've been using it. Forever in aerospace and wind, and that's where Brad comes in. And Brad's company has developed a way to eliminate the Peel ply, which is a huge cost savings and a labor savings and a, you know, a downstream savings. Brad, you wanna under describe the, what you're bringing to Tightline and, and how this technology works. Brad Schmidt: So we do protrusion within Aviant as well, and we've developed this over the last four or five years and have been using it internally. For our own glass profiles, um, in, in various markets, including wind. Um, but essentially, yes, have eliminated the need for these glass protrusions to, uh, you know, require peel, ply or alternatively sanding or some sort of grinding process prior to, um, adhesion. So the, it is, it is actually in the chemistry of the [00:05:00] resin system. It's not a surface treatment and it is throughout the part. Um, so if you cut the, you know, through apart that same adhesion, uh, you know, or bond strength will be realized throughout the, the Matrix. It's not just on the surface. Um, so again, we've been using this in-house for a number of years. We've known the Tightline team for some time, and we approach them. Late last year, uh, about six months ago, let's say. And um, obviously there was a lot of interest in tightline. There was a lot of skepticism at first in that, uh, this would even work, but they were willing to give it a try. So we sent them a small batch of resin with this, call it an additive in it. They ran some trials and then we tested in our lab, uh, did the lap shear testing on a traditional, uh, carbon plank with peel ply. And then a protruded plank without peel ply. With this new chemistry, we saw on average about an 8% [00:06:00] improved improvement in bond strength in the, with the chemistry versus the traditional peel ply, and a much tighter standard deviation in that bond strength. Joel Saxum: So let me, let me, let me get this straight. So you not only have removed waste, removed the cost of those, the procuring of the PO ply materials. Increase the ability for manufacturing processes to be correct and at the same time have improved the strength of the bond. That's right. Brad Schmidt: Yeah. I mean, um, and seems too good to be true, right? And we're trying to find out where this doesn't work, but, but we haven't, yeah, we have not been able to poke holes in it yet. Um, and then on the mechanical property side, uh, they've actually seen a slight improvement. Um, and in theory now without Peel ply, you can add a bit more carbon. Where the PO ply would've previously taken up space in the dye. Right. Um, and the additive is, is at a very low concentration, so it's had no detrimental effects on any of the mechanical. Properties. Allen Hall: That is amazing. So [00:07:00] obviously the first question that any composite engineer is gonna ask is, well, it, it's a resin change, right? So I gotta requalify the material. But it's not really a resin change are you're still using the same resin system. Correct. So it is, it is it. Is it a magic powder or a chemical treatment to the existing resin system? And I, you know, composite engineers are always weary of change, right? If they have something they, that they know, they tested, it's been through all the processes and all the approvals, and now you wanna make a change. So the, the always the answer is no, which is crazy because if, if you're improving it and you can show it and you have the data to back it up, and Ian's gonna do that. You can use the same resin system, just add a little bit of technology to it to remove peel ply, and, and that's the approach. So it's not a, um, it's not a wholesale change in the resin system or the strength of the system. It is in the, the surface energy piece. That technology is pretty transferrable, right? I mean, [00:08:00] pretty much anybody with an existing resin system can use this technology, right? Brad Schmidt: Yeah, absolutely. So we developed this originally in a vinyl Lester system. We've since proven it out in, um, developed it in polyester as well as epoxy, which is used in the, uh, the carbon poulation process for the planks. Um. So it's absolutely transferrable. Like I said, it's at a very low concentration, so it is the same base resin system just with our, uh, you know, magic powder as you referred to. And I think Joel Saxum: I ask you a, a, a question that's a little bit. Um, so we were talking about carbon protrusions and other kind of protrusion, cla protrusions and different vinyl es the things that you've done in the pultrusion space. This is fantastic. However, let me ask you another question. If this is mixed with a resin system, where else can it be used? Can it be used in repairs? Could it be used in, I know like one of the things that happens in wind right now, Alan and I talked too about it regularly, is these root bushing pullout things and there's a couple companies working on Gulf wind [00:09:00] technology. We foresee there's some people working on fixes for these. Could this be added to whatever resin systems they're using and increase? And I'm thinking about that 8% strength in bond number. Can that be used as a repair methodology too? Yeah,...

  • October 20 · 25 min

    Nordex Q3 Orders Jump 30%, Vestas Bets on Australia

    Nordex Q3 orders jump 30% and Vestas lands about a gigawatt in Australia. Plus why turbine factories skip Australia, high project costs, and whether batteries can replace coal. The Uptime Wind Energy Podcast is brought to you by Weather Guard Lightning Tech, creators of the StrikeTape Ultra LPS retrofit. Subscribe to Uptime’s Substack newsletter. And check out Rosemary’s "Engineering with Rosie" Youtube channel. Have a question we can answer on the show? Email us! Episode Transcript Allen Hall: Welcome to the Uptime Wind Energy Podcast. I'm Allen Hall, and I'm here with Matthew Stead, Yolanda Padron, and Rosemary Barnes, who is in Sydney, Australia, attending some business conferences. Rosemary?Rosemary Barnes: Right now I'm in Sydney. I was at an ARENA innovation event last night, and it was matching up startups with investors. It was a great event, actually. I got invited because I was moderating a panel. Not all startups, though some of them were. I had the head of sustainability at Qantas there, Fiona, and then Katherine from Brighte. They do a bunch of financing, mostly for distributed energy and household consumer energy products like rooftop solar and batteries. And then Jack from Neara, and they do grid simulation. It's pretty cool. If you run a network and you want to know how to best improve resilience while spending the least money, they'll model things like, okay, if this particular pole falls over, then this will happen. And you can improve resilience by just adding a guy wire to this one asset, and you're not going to take down any additional poles.Anyway, we talked about the Australian energy landscape and investing in technologies in those areas. Some of the strengths we have in Australia have a lot to do with distributed energy. We're really leading the world there, and there's heaps of opportunity for innovation and for companies to solve problems in these spaces. I also talked about some of the categories that aren't so easily decarbonized.We had Qantas there, and they're investing a lot in sustainable aviation fuel. I really enjoyed talking with Fiona before the event, because one of my problems is that I travel so much for work. I do make sure the travel I do is for the climate benefit, so I don't ultimately feel guilty about it, because it has more impact than the emissions of the flight by a long way. However, I do want to decarbonize aviation. I love to travel, and I would like to be able to continue to do that in the future.So I talked with her about that. I really want to be able to buy sustainable aviation fuel, because one, it actually does something, and two, it's an industry that needs to grow and scale, and I would like to support some of that scale-up in an appropriate way. She let me know they've got a small business scheme now where you can get in touch with them and buy it. We also discussed maybe a collaboration with Engineering with Rosie, a video about some of the projects they're investing in. So that was really cool.Later in the evening, five startups pitched to investors, and it was a really great investor-to-founder ratio in the room. For every startup there trying to get money, there were probably five investors trying to find people to give money to. It's definitely a good event to go to, and they do it annually, so it's one to keep on your calendar.Allen Hall: Did you break out your checkbook and invest in one of these companies?Rosemary Barnes: I would really love to. My investment strategy is that I invest $1,000 to $5,000 in companies. I don't do heaps of financial due diligence. I just do the technical due diligence: is this a real problem that's going to need to be solved, do I trust the engineering, does the team seem like they get it? That's as far as I go. And I invest enough money that if it goes wrong, it's not the end of the world. I have lost all of my money on a few investments, and I've made 20 or 30 times on some others, so it works. I would love to give $1,000 to $5,000 to probably three of these five companies, but that's not the kind of money they need. You'd have to add several zeros onto the end of that. I'm just waiting for my first big success so I get my $100 million in the bank, and then I'll go around funding. Or if someone's like, "I've got $100 million and I don't have any technical judgment," feel free to give that to me.Nordex Q3 OrdersAllen Hall: Well, there's a company over in Germany you probably should invest in right now, which is Nordex. Do you have any money in Nordex right now?Rosemary Barnes: I don't have any money in any wind turbine companies. I did early on, in 2010 or whatever. I was like, well, we know wind is going to grow huge, I'll invest in this. And it did grow huge. I was right about that. But no one made any money. If I was going to invest in wind, and I do, because I have a wind energy company, so I guess all of my investment is in wind, it would definitely be in small individual solutions that I thought were needed.Allen Hall: I think you're missing out, because Nordex is expanding way beyond Germany. Third quarter orders jumped 30%. Thirty percent is a magic number. That's amazing. They have about 2,800 megawatts in orders just in the third quarter. Turkey brought in more than 900 megawatts, and U.S. orders have topped about 1.3 gigawatts this year. So Nordex is really growing quickly. CEO José Luis Blanco expects the international share will keep growing, and I assume one place it will be pretty soon is Australia. And they have this new turbine they're selling down in South Africa for moderate wind speed areas. It does seem like Nordex is taking the place of maybe a Siemens Gamesa onshore, maybe a GE in certain places, and that they're actually competing against Vestas, which is hard to believe, because five years ago, if you mentioned Nordex, it would have been like, they're a small player. They have some cool technology. But boy, have they ramped up.Rosemary Barnes: Sounds like you've got an investment to make, Allen.Yolanda Padron: From conversations we have with a lot of the owner-operators in the U.S., a lot more people are looking into Nordex or purchasing from Nordex, which is really good to hear, to have a bit more diversification in wind turbines and wind turbine owners.Allen Hall: Matthew, are you putting sensors on Nordex turbines yet?Matthew Stead: Yeah, definitely, probably more from an icing point of view. So definitely in the Nordics, optimizing power production. I would agree with what you're saying, Allen. Within our team, the discussion around Nordex is, yeah, we're always talking about Nordex.Allen Hall: It's crazy how much the industry has changed. If you see a Nordex representative, they have a lot of products to offer. Obviously, when Yolanda and I are talking to operators in the U.S., Nordex comes up most times. Right now it's Vestas and Nordex as the two. GE is sort of a distant third, and I haven't heard anybody say Siemens Gamesa's name in months. Big shift.Well, that's the Nordex update. Next, Vestas CEO Henrik Andersen on why Australia now matters to Vestas.Vestas in Australia and Local ManufacturingAllen Hall: Are you overspending on lightning repairs? Most operators are, because solving lightning damage is complicated. Weather Guard Lightning Tech helps operators reduce lightning damage. Our StrikeTape lightning diverter protects over 20,000 blades worldwide. Now StrikeTape Ultra installs faster than ever. StrikeTape Ultra cures up tower in just 15 minutes, even in cold weather. Visit weatherguardwind.com to schedule a call.Europe's fleet is getting older, and someone has to keep it running. In this edition of PES Wind magazine, there's an interview with Matthieu Dessailly of MDWind. He's talking about how MDWind has changed its focus from doing a lot of installation work to major component exchanges and life extension, the things that keep turbines running for the longest time possible. He says owners must treat their turbines as industrial assets, not just financial ones. And that's true. This is a really good article, because it touches on a number of points having to do with wind turbine maintenance and how to keep your turbines running efficiently, and not treating them as something that gets tossed away, as has happened in some places. So don't do that. If you want to read this article or many of the other articles in this edition, you can go to PESwind.com and download a free copy.Australia is turning into a big market for Vestas. CEO Henrik Andersen says so himself in a LinkedIn post. He points to three Australian orders this year, adding just about a gigawatt. Andersen links the orders to Australia's push for energy independence and more stable power prices. And Vestas crews are busy in Australia right now installing turbines on two projects. So it does seem like there's been a Vestas invasion into Australia. And most of the turbines in Australia right now are Vestas, right, Matthew? That's the numbers today.Matthew Stead: Yeah, I was going to say, what's the difference? They've always been here. They've always been strong. Most of the turbines behind me are Vestas models. So as far as I'm concerned, they invaded Australia a long time ago.Allen Hall: Are they offering bigger turbines in Australia than some other places? But more importantly, are they going to build any sort of factory in Australia to build blades, nacelles, or tower sections, for that matter? Anything in regards to turbines?Matthew Stead: My guess is no. I don't think anyone has seriously considered building factories in Australia. Rosie probably knows more than I do.Rosemary Barnes: I don't disagree with that. We would love for them to do it, and it could happen. It would just need to be a conscious choice, probably involving the Australian government. Not necessarily, but that would be the easiest way. I don't see it happening. However, one of the sites I'm working on at the moment has quite old

  • October 19 · length unknown

    Trump Targets Revolution Wind, Nordex Q3 EBITDA Doubles

    Allen covers the Trump administration’s bid to reopen Revolution Wind’s permit, a bipartisan Senate permitting deal, Nordex’s doubled third-quarter profit, and GE Vernova’s new wind chief. The Uptime Wind Energy Podcast is brought to you by Weather Guard Lightning Tech, creators of the StrikeTape Ultra LPS retrofit. Subscribe to Uptime’s Substack newsletter. And check out Rosemary’s "Engineering with Rosie" Youtube channel. Have a question we can answer on the show? Email us!

  • October 15 · 26 min

    How CICNDT Qualifies Inspectors for Complex Blade Scans

    Jeremy Heinks, founder and CEO of CICNDT, joins to discuss the inspector shortage, Level III oversight, blade samples, drone thermal limits, and IEC updates. The Uptime Wind Energy Podcast is brought to you by Weather Guard Lightning Tech, creators of the StrikeTape Ultra LPS retrofit. Subscribe to Uptime’s Substack newsletter. And check out Rosemary’s "Engineering with Rosie" Youtube channel. Have a question we can answer on the show? Email us! Episode Transcript Allen Hall: A lot is happening in your world. And in our world, too, as lightning protection people, because we are all dealing with damage to composite structures and wind turbine blades. Over the last couple of months, there have been some really complex problems in the field. And what I am seeing, and maybe you're seeing the same thing, is that some of the technicians out there trying to scan blades are just not qualified to do some of these complicated inspections. Blades are getting very complex now, with carbon in them and all the bonding issues. Are you seeing something similar from where you sit?Jeremy Heinks: It's not just service. It's at the supplier level, and it's at the OEM level, where they're trying to do something, but it's hard to come by the right people and make sure you're following a standard of sorts. But yeah, we're seeing that there's a genuine lack of properly qualified and certified people doing the work.Allen Hall: Is that a training issue, or just because there's so much demand for that expertise?Jeremy Heinks: A little bit of everything. Wind, even though it's been around for a while, is still relatively new to a proper inspection system. So having the right training in place, not getting taken advantage of by training centers, and having training that's actually focused on what we use for day-to-day inspection of blades is one thing.The other side of it is there's a global shortage of NDT technicians. It's just like any of the other trades that are really in demand. If anybody wants to get into something and have, not an easy life at work, but a decent chance at success and making a decent amount of money, then NDT is definitely the way to go, because there are huge shortages. Aviation and space programs are booming right now, and they're all looking for technicians.Allen Hall: Yeah, I've seen a lot of requests out there, particularly from defense companies that are building complex composite structures, and the job postings for NDT personnel. And they're paying really good money right now to find those people.Jeremy Heinks: Oh, absolutely. We just got a request from one of the big names here in the US for 86 technicians. And I'm like, there's no such thing as 86 technicians out there.Allen Hall: Yeah.Jeremy Heinks: You'll get one or two here and there, but there's just not that many available at the moment.Allen Hall: Well, back in the blade world, we're kind of wrapping up the blade season this time of year, and it gets a little bit heavy as everybody realizes, oh, I have some damage I didn't see before. A lot of drone inspections are happening, which then draw you in on NDT. As an operator, what are people to do here? I hear a lot of complaints that it's really hard to find somebody who knows what they're doing. I always point them to CIC and tell them to call you and get started there. But what should they be doing, and what should they be looking for when they have complex composite problems?Jeremy Heinks: Like you say, a lot more people are bringing inspection companies in, which is great, and we need to see that. But once you've made the decision that you need NDT, you've got to make sure you're getting what you pay for and the quality of service you expect to receive.So typically there are some questions you want to ask. Do you have a Level III in the method of inspection who is going to oversee everything from education to certification and qualification? And if they have Level IIIs, how do they take care of their technicians in the field? Are they qualified and certified? Do they log their hours? They have to have this whole structure around keeping up these standards. And this is why NDT technicians and NDT inspection are so expensive compared to a regular field tech. The repair guys are expensive too. They pull a lot of money because they're highly skilled. Same thing on the NDT side. You're working with a very small group of people who have the skill set and keep up with the training and certification. So you want to make sure they have the proper Level III, and you want to make sure their technicians are properly trained and certified.You also want to know their equipment and their application, so their techniques for the inspection. Let's say you have a root inspection or a bond inspection. They need to have something to show you that says, this is our application technique for that specific inspection, if there is one. A lot of times, like with lightning strikes, there isn't really anything that's perfected. Even though we've done a lot of work on the aviation side, bringing that over to wind is a whole other animal. But that's part of the process. You do your R&D in-house. We do that here at our lab, where we get samples from the customer if we're lucky enough, or we have something from different sources, and we perfect the inspection method and the technique, and that gets written into a work instruction. That way you have something to show the customer, and they can feel comfortable with the results you're going to give them.Allen Hall: So having a plan before they get on site, which doesn't always happen.Jeremy Heinks: And it's tough, right? Because a lot of times these blades are older, or the OEM [inaudible], so you don't have samples lying around. Then you've got to figure out what this blade type is similar to, and hopefully we have samples. We have a bunch of different samples in-house that we go to for different blade types, different laminate stacks, different bond line setups, different sections. And unfortunately, with the number of blades that are failing or getting repowered, there are a lot of places you can go to get these samples nowadays. But when you're buying a brand-new blade from the manufacturer, it wouldn't hurt to see if they can make you some samples and put them in storage, just in case.Allen Hall: Right. And that world is so wrapped around the actual construction. Even if you had a set of drawings, it doesn't really help you too much. You need an actual sample to see what's happening deep inside, particularly on really thick composite parts, like root bushing issues or root inserts. Those are complex areas because you have metal, epoxies, resins, and composites. Having a section of that at least gives you a chance to see where defects lie and to bring the right tools to site, which is my big complaint. When I see technicians arrive with the wrong tools, I think, what are we doing? It almost should be standard practice in the NDT world to at least have some cross-sections.Jeremy Heinks: Right. Blades are extremely complex, even compared to the things we see in the aviation world, because you've got these really different materials coming together. In aviation, you typically have a composite structure where everything is going to be kind of the same. In a root section, you have steel bushings, and some of them have protrusions. There's a whole bunch of different material types stuck in a small area, and that makes it extremely difficult. Even bond lines and different web types, where you have PET core versus a regular foam or balsa, all those things throw off your inspection completely. We typically use ultrasound, and ultrasound will react differently to all those materials.So when you scan across the bond line, or if you're using thermal or something else, the energy is going to transfer and reflect differently with each of those materials. If you don't have a representative sample, it's really hard to know what you're getting yourself into as an inspector. And that's where the Level III support comes in.We learn a lot of stuff in the field. Unfortunately, we're reactionary. We'll go out there, they'll say, hey, start scanning, and we have to get that raw data back to our Level IIIs to look at and say, all right, this is what's going on with the sound as it penetrates the part, and these are the materials that are in there. Then we use our experience, because we've got multiple guys who have been doing this for 10, 15, 20-plus years. We know what's out there and what we've seen before, and we can make adjustments so the inspection is successful.Allen Hall: So what happens when you have three or more manufacturers of the same blade? When you show up on a site, particularly in the US, you will have that. GE is a good example: LM, TPI, and MFG. So we have three different manufacturers. Plus, LM may have different factories producing the same blade. Those blades are not identical in terms of their construction and materials. Does that mean we need a TPI cross-section, an MFG cross-section, and an LM cross-section to really understand what's happening inside?Jeremy Heinks: At the end of the day, it would be perfect to have those, because there's a lot of difference. The manufacturers' molds have different fitments, or their material suppliers are different, so you're getting different things. The internal geometry of the part will be different, not just the actual shape. And the material velocities will be different because there's a different resin supplier, a different adhesive supplier, different everything. All that stuff does make a difference, and it would be better to have those things. But unfortunately, you probably couldn't get something like that from everybody.Allen Hall: Well, that's what a Level III is there for, to sort of determine, this doesn't look quite right. Maybe it's a different resin system than we've seen before,...

  • October 13 · 20 min

    China Barred Vestas Software, Ørsted Buys Chinese Monopiles

    Vestas CEO Henrik Andersen says China barred Vestas from monitoring its own turbines. Plus Ørsted takes heat for Chinese monopiles, India’s blade design gap, and tents that beat weather delays. The Uptime Wind Energy Podcast is brought to you by Weather Guard Lightning Tech, creators of the StrikeTape Ultra LPS retrofit. Subscribe to Uptime’s Substack newsletter. And check out Rosemary’s "Engineering with Rosie" Youtube channel. Have a question we can answer on the show? Email us! Episode Transcript The Uptime Wind Energy Podcast, brought to you by StrikeTape, protecting thousands of wind turbines from lightning damage worldwide. Visit StrikeTape.com. And now, your hosts.Allen Hall: Welcome to the Uptime Wind Energy Podcast. I'm Allen Hall, here with Rosemary Barnes, Matthew Stead, and Yolanda Padron, and we're getting ready for WOMA 2027. WOMA in Australia will be in its third year, and we're going to be at the Pullman East Melbourne. It's the same location, but the name of the hotel has changed. We'll be there March 3rd through the 5th. We've heard from a number of OEMs, which is really great, but there's one in particular that hasn't registered yet, which is GE Vernova. We thought they'd be first in line. That was my bet, that GE Vernova would have been signed up and ready to go. But there's a latecomer to this party. Rosemary, how do we get GE Vernova to show up to WOMA?Rosemary Barnes: I don't know. I don't have so many links to the company as I used to, and I don't always have the best luck getting in touch with my old colleagues. I guess they're busy, because there's not so many of them left there now. We have so, so many turbines here, and our asset managers are really engaged on all of the technical issues. They really want to understand what technologies are available, both for new projects that are coming up and for operations. The operations teams are getting involved more and more in purchasing decisions. Their opinions are being asked for. The Australian wind industry is a lot different than it was five years ago. People didn't know so much, and I think they relied on the OEMs' word for what we need in Australia and what's available. Whereas now, asset owners know what we need and what kind of problems we have, and they're really looking for technical information about solutions. The companies that are at the event to provide that information are the ones people are going to feel positively about. So I would recommend getting there to everybody, not just GE, but all OEMs from any part of the world. Not just Western ones, but Chinese ones too would be really great to see.Allen Hall: And Matthew, if GE Vernova wanted to register for WOMA 2027, what would they do?Matthew Stead: They would very easily go to WOMA2027.com and register. It's that easy. That's all they have to do.Allen Hall: And we'll stop talking about it.Matthew Stead: On the agenda, there is a specific session that OEMs are attending, and the intention is that the OEMs can have a good, open discussion about what's going on in OEM land and get familiar with the audience. Then they can get questions answered right there on the floor, which is really, really important for the customers. Most all the operators in Australia and the surrounding areas will be at WOMA 2027, so it's a good opportunity to talk to your customer base.Allen Hall: That's why we're recommending all the OEMs show up this year. Hopefully GE Vernova does it.Vestas CEO on China and EuropeAllen Hall: And speaking of OEMs, Vestas is in a bit of a unique spot, because the CEO of Vestas, Henrik Andersen, had an article in Fortune magazine. And I thought, that's unusual. Why is he in Fortune magazine? Well, it's a little bit of a life story, growing up as a kid and dreaming of wind turbines. I guess that's a thing in Denmark. But he says that Europe must shed its naivety. Rosemary, five years ago, Chinese authorities barred Vestas from monitoring or running its own software on turbines in China. And now Andersen is asking why Chinese software and turbines should be welcome on Europe's grid. That's a really great question. Well, I have heard it, but I haven't seen it written down anywhere that Vestas got cut off from its own turbines. This was a couple of years ago, when China passed a number of laws about data security and was not going to let a lot of data out of China. At the same time, they put security measures in place where Chinese companies operating outside of China would have to store the data in China. This obviously creates a unique condition for companies like Vestas or Siemens Gamesa, where they're trying to sell components into China, but they can't operate them. And now China wants to come into Europe and do the reverse. Is it hypocrisy? Is it a security threat? What are we thinking, and how should the Europeans really approach this problem?Rosemary Barnes: I think it's interesting timing to announce it now. Well, it's not really interesting, it's obvious why it would be announced now, because obviously Vestas benefits if Europe decides not to allow any Chinese manufacturer data to leave the country, or to be used in the first place, like they've done, I think, with inverters and some other equipment. So that's kind of obvious. I'm assuming it's true, and I would imagine that it is, because it's a bit risky to publish something like that if it's a lie. But I think the more interesting question is, why haven't they said it for the last five years, if this has been going on that long? The only likely explanation I can think of is that five years ago, they didn't want to risk their relationship with China. They were still planning on selling a bunch of turbines within China. And by now, they realize that's totally hopeless, so they don't care about the Chinese market anymore. It doesn't matter if they piss off China. They're going after the rest of the world. So it makes sense from that point of view. But it is a big secret to have kept for five years, kept out of print, as far as I'm aware. I don't know if I'd heard that that was the case, but I've certainly had conversations with people like, do you really think China allows the reverse of this situation? So I think people assumed it was the case. Maybe there were some people that knew. But it's not been publicized in print the way that it has now.Ørsted and Chinese MonopilesAllen Hall: And Yolanda, Ørsted's getting caught in the crossfire here, because Ørsted is buying some monopiles and cables from China. The CEO of Ørsted is getting caught between the unions and the groups that are proponents of European employment, saying, hey, if we don't want Chinese turbines, why are you buying Chinese components? I think the answer has been that it's less expensive, but the Ørsted CEO is getting a lot of flak about that, at least in the press. Is that just a trade-off, like it's just cheaper to buy the components and we want to have some relations with China, which Ørsted probably does, and it's just trying to smooth everything out? Or is this going to turn into something much larger, which it does feel like is happening at the moment?Yolanda Padron: I think Ørsted's in a strange position, but it's important to remember that yes, Ørsted does obviously have Danish roots, but it's a global company. They have their assets and a lot of customers almost everywhere, and a lot of employees that they need to pay. So they need to make some money. They can't just have everything be 100% Danish if that's not going to be the most cost-effective or the most efficient solution for any components they're buying.Matthew Stead: I was just going to add that I was looking at the Chinese market in terms of monitoring wind turbines, and it was basically too hard, because our business model is to send data to the cloud, and we were not allowed to send any data out of China back to our system. We would have had to completely re-engineer everything. That was about three years ago. So I can absolutely confirm that it's very difficult to get data out of China.Allen Hall: Well, China's reach extends to a lot of places, including India. Next, a Gurit executive says Indian blade makers lean on Chinese designs, maybe a little bit too much. We'll be back in a moment.Allen Hall: Are you overspending on lightning repairs? Most operators are, because solving lightning damage is complicated. Weather Guard Lightning Tech helps operators reduce lightning damage. Our innovative StrikeTape lightning diverter protects over 20,000 blades worldwide. Now, StrikeTape Ultra installs faster than ever. StrikeTape Ultra cures up tower in just 15 minutes, even in cold weather. Visit WeatherGuardWind.com to schedule a call.India's Blade IndustryAllen Hall: Longer blades are bringing new problems, and Jesper Sloth of materials supplier Gurit says India is behind on many of the fixes. This is a pretty extensive article with Jesper giving his thoughts on what's happening in India. He's saying many Indian blades still use glass spar caps and simple lightning protection systems, and not much in terms of leading edge protection. A lot of those designs are originating from China, and Sloth is saying those designs are typically a few generations behind, which makes local improvements in Indian materials hard to qualify, and makes it hard to get blades designed to European or American standards. It may take a little while for India to stand up a truly scaled, advanced wind turbine industry. This is a little controversial, because I know India is very proud of what they've done so far, and honestly, they're way ahead of a lot of other countries in the wind business. But there are places where I think everybody around the world could use some cross-pollination on what's happening in another part of the world to advance their wind turbines. I wouldn't say India is unique in that. Would you, Matthew?Matthew Stead: Yeah, I was just wondering whether the Indian turbines hav

  • October 12 · 3 min

    Ørsted Finishes Drone Trial, Iberdrola Exits South Korea

    Allen covers Ørsted’s Hornsea 2 drone trial, the DeepWind test site, Germany’s proposed land rent cap, and Iberdrola’s Korea exit. The Uptime Wind Energy Podcast is brought to you by Weather Guard Lightning Tech, creators of the StrikeTape Ultra LPS retrofit. Subscribe to Uptime’s Substack newsletter. And check out Rosemary’s "Engineering with Rosie" Youtube channel. Have a question we can answer on the show? Email us! Episode Transcript Good Monday everyone. Every wind farm is at least a twenty-year promise. This week ... the industry learned which risks it can engineer away ... and which ones it cannot. Start in the North Sea. A delivery just went out at Hornsea 2. No crane. No vessel at the base of the tower. No technician hauling a heavy bag up the turbine. Ørsted and Skyports just finished a four-week cargo drone trial there. The drones carried maintenance kits from the service vessel to the top of the turbine. Each kit held the tools and parts for one job. Each one weighed fifty-five to sixty-five kilograms. The kits arrived before the technicians did. When the work was done ... the drone flew them back. A new automatic hook picked up each load. Nobody had to clip it on by hand. And the turbine kept making power during the delivery. Then came the milestone. The team flew its first delivery beyond visual line of sight inside a working wind farm. About four kilometers ... run from the vessel. Britain's Civil Aviation Authority cleared the airspace. It says routine flights like this are the next goal. Ørsted's project lead says the trial confirms the plan. Drone maintenance is moving into routine operations. Stay in Britain ... where the next generation of offshore wind is getting a proving ground. The government's research agency just gave three million pounds to the European Marine Energy Centre. The money moves a project called DeepWind toward a final investment decision. DeepWind would be a national test site for floating and deepwater wind. The target is twenty thirty. The center says Europe's test sites don't offer the depths and seas that Britain's future projects will face. Testing a floater in calm water is one thing. Surviving a deepwater winter is another. Moorings, anchors and dynamic cables would all be proven at full scale. The center's operations director says the goal is simple. Make deepwater wind insurable ... and bankable. Three million pounds won't build it. It pays for two years of design, permits and planning. And the center is still asking developers and suppliers what they need the site to do. So the engineers are taking risk out. The politicians ... are putting some back in. Germany wants to cap what wind farms pay for land. Under a draft reform of its renewable energy law ... rent could not top three and a half percent of a wind farm's yearly revenue. The cap would last twenty years. It would even cover some leases already signed for projects not yet running. The first draft said two and a half percent. The states and the industry pushed it up. Germany's municipal utilities back the plan. They say it could save about thirteen billion euros in support payments by twenty forty-five. A landowner would still get about thirty-two thousand euros per turbine each year. But eighteen banks wrote the ministry an open letter. They say the cap adds uncertainty. And checking every lease for twenty years costs money. Enough money, they warn, to wipe out the savings. Germany's renewable energy federation says one cap can't fit every region. Forest owners and family farms go further. Their legal opinion says the cap may clash with Germany's constitution. And a landowner who doesn't like the deal ... can simply say no. Now to Spain ... where one of the world's biggest wind companies explained why it walked away from South Korea. Iberdrola signed a deal with GS Energy in twenty twenty-one. It never built a thing there. Iberdrola's head of international business says the problem was not the wind. It was the government. A wind farm runs for twenty years or more. But in South Korea, the terms of power contracts could change with every new administration. Iberdrola is not alone. Equinor dropped its Korean offshore projects this year. It says it will not be back. Corio Generation closed its Korean office in March. Shell left in twenty twenty-four. RWE is scaling back. They point to slow permits, weak grids and rising costs. The Iberdrola executive points to America, too. This year, the Trump administration halted several offshore wind projects. Still ... she says the door to Korea is not locked. Demand is high. And Iberdrola is watching. So what should wind professionals take from this week? First ... technical risk is getting cheaper to solve. A drone trial and a test site cost a few million. And they lower the risk for every project that follows. If you make moorings, anchors or cables ... DeepWind is asking for your input right now. The specs written in the next two years will shape that market for a decade. Second ... watch the cost of capital, not the headlines. Germany's cap saves money on paper. But when eighteen banks object in writing ... those savings can come back as a higher interest rate. And that is the state of the wind industry for the 12th of October 2026. Join us tomorrow for the Uptime Wind Energy podcast.

Showing 1–20 of 68 episodes