GreenEdge: Best in BESS - ENG

jerzykuzminski

A podcast about battery energy storage and the Polish renewable energy market — no marketing fluff, just real examples and verified information.
We cover the entire BESS project lifecycle: development, permitting, EPC, commissioning, optimization, and O&M. Benefits, risks, real costs, investor mistakes, and how to spot a reliable contractor.
Universal BESS insights plus Polish market specifics — for investors entering storage business or companies looking to cut energy costs with C&I solutions.
Hosted by Jerzy Kuźmiński

Play
  • 21 episodes
  • fortnightly
  • Avg 29 min
  • English
Counted on this page — what you have heard stays on this device, so it is not something the list can be paged by.
  • November 18 · 34 min

    21: BESS Suppliers - What Really Makes One Container Different from Another

    The same BESS suppliers bid in Poland, Germany, Italy and Romania, with the same containers, the same datasheets and the same promises. Every one of them is the market leader, every offer looks identical, and investors still compare above all the price per kilowatt-hour. The real differences are deep in the containers, where nobody actually looks.. In this episode, we return to supplier selection, this time from the technology side. We start with who you are really talking to: an integrated manufacturer, a system integrator or a white-label brand, and what "Tier 1" actually means. Then we go down to the cells: why the cell manufacturer can change between versions of the same offer, how cells are graded, why their production date matters and who actually tests them. We look at the small print next to degradation curves, why a round-trip efficiency above 90% at the medium voltage metering point is not achievable, and why auxiliary consumption in July can be twice the datasheet value. We explain how cell balancing in LFP affects what your optimiser can do, and cover cooling, fire protection, build quality, PCS and MV stations. Finally, what happens after signing, when you really see what kind of supplier you have chosen. Questions or support with a BESS project: contact@greenedge-solutions.com | www.greenedge-solutions.com

  • November 7 · 28 min

    20: From Energization to COD

    Polish storage projects are moving from development into execution, and the market is not ready for it. In the twentieth episode of GreenEdge - Best in BESS, I go through everything between energisation and the day a storage system starts earning money in Poland. That covers the Polish requirements on top of NC RfG, the prerequisites for the supplier’s commissioning team, cold and hot commissioning, system integration, FAT, SAT, PAC and FAC, and the first day of operation, when the contractor leaves and somebody has to open the gate. In this episode I follow a storage project through the months that decide whether it starts earning on time: from the Polish operator’s requirements, through a supplier’s team arriving on a site that is not quite ready and integration tests where everyone blames someone else, to the acceptance documents you sign and the first service visit that ends at a locked gate. Questions or support with a BESS project in Poland: contact@greenedge-solutions.com | www.greenedge-solutions.com

  • November 1 · 32 min

    19: Balancing Market Qualification in Poland

    The storage system has passed its tests at takeover, the contractor has left the site, the optimiser is waiting for data, and the balancing revenue that the financial model assumed from day one is still not coming in. Each party has done its part under its own contract, and the investor is left alone with the problem. In Poland, qualification for balancing services sits at the interface of three parties, the asset owner, the EPC or balance of plant contractor and the optimiser, and none of them has it fully within its own scope. In this episode we walk through the qualification process under the Polish balancing rules (WDB), based on the studies we have prepared on this topic. We explain why grid connection compliance tests cannot replace the verification tests PSE requires for a battery storage system. We show when qualification is lost and what triggers requalification, why changing your optimiser means a new process, and what a firmware update has to do with it. We look at what sits with the contractor and what sits with the DUB, why a home-market optimiser cannot simply bring its integrations to Poland, and what you as the investor have to prepare on your side to connect the storage system to the optimiser’s node. Finally, six steps to align the EPC contract, the optimiser contract and the LTSA, so you are not left alone with the problem. Questions or looking for support on a BESS project in Poland? contact@greenedge-solutions.com | www.greenedge-solutions.com Looking to extend this knowledge further, or get your whole team aligned on it? Visit the training tab on our website to learn more about our BESS training programme. https://greenedge-solutions.com/en/bess-training/

  • October 25 · 25 min

    18: Battery Recycling Obligation in Poland

    Who is the producer of the batteries in your BESS project? Most investors would point to the cell manufacturer in China or the integrator whose logo is on the container. Under the EU Battery Regulation, it is very often the Polish SPV that owns the project, and with that role comes the obligation to organise and finance the collection and recycling of the batteries once they become waste. In this episode I explain who counts as importer and producer under Regulation 2023/1542 and what the importer has to do before the containers reach the site. I also cover the Polish obligations that still apply because the new national act has not been adopted. We look at why the choice between FOB and DDP largely decides where these obligations land, why an EPC contractor can become a producer without knowing it, and why modules replaced after the warranty are a closer risk than decommissioning in fifteen years. Finally, I list the questions to add to your due diligence when you buy, finance or sell a project in Poland. Questions or looking for support on a BESS project in Poland? contact@greenedge-solutions.com | www.greenedge-solutions.com Looking to extend this knowledge further, or get your whole team aligned on it? Visit the training tab on our website to learn more about our BESS training programme. https://greenedge-solutions.com/en/bess-training/

  • October 17 · 28 min

    17: The EPC Contract in Poland

    EPC Contract for your BESS Project is not something that you will sign within a week or two. There are tens of pages of provisions that someone needs to verify and adjust to your expectations. In this episode I walk through the EPC contract chronologically - from why your RFP quality directly determines your contract quality, through scope of works and the site security system, SCADA and schedule, to the FAT/SAT/PAC/FAC acceptance sequence, performance guarantees, and penalty structure. Looking at it from both perspective, because a fair contract has to work for the investor and the contractor alike. I close with something that is especially important for a foreign investor executing this contract in Poland - governing law, dispute resolution, and the local practicalities a standard EPC playbook does not cover. Questions or looking for support on a BESS project in Poland? contact@greenedge-solutions.com | www.greenedge-solutions.com Looking to extend this knowledge further, or get your whole team aligned on it? Visit the training tab on our website. https://greenedge-solutions.com/en/bess-training/

  • September 5 · 25 min

    16: Due diligence of a BESS Project

    Buying a ready-to-build BESS project or developing one from scratch is where the most expensive mistakes happen. A battery container can be compared on a spec sheet, but a development project is unique to its location and demands individual verification. In this episode I walk through the entire due diligence chain: the land lease terms that can kill project economics, how to interpret zoning documents for a battery installation, what Poland's incoming "general plans" mean for permitting after mid-2026, how to read grid connection conditions and price the operator's side of the work, noise limits that can rule out a site entirely, cable route easements, and the difference between a technical design and an executive design. Questions or looking for support on a BESS project in Poland? contact@greenedge-solutions.com | www.greenedge-solutions.com Looking to extend this knowledge further, or get your whole team aligned on it? Visit the training tab on our website to learn more about our BESS training programme. https://greenedge-solutions.com/en/bess-training/

  • August 30 · 28 min

    15: Price Arbitrage - Foundation or Supplement to the BESS Revenue?

    Day-ahead and intraday markets are where a battery storage system earns money by buying electricity cheap and selling it expensive. It sounds simple, but the practical questions pile up fast: what are real spreads in Poland right now, can arbitrage be combined with balancing services, how many cycles does it actually consume, and will banks accept arbitrage revenue as a basis for financing? In this episode I go through how day-ahead and intraday arbitrage work in Poland, how spreads move seasonally, how to stack arbitrage with FCR, aFRR, and mFRR without one cancelling out the other, what arbitrage costs you in battery degradation, how it applies to C&I installations, and why bankability usually comes down to a floor-plus-profit-share structure. Questions or looking for support on a BESS project in Poland? contact@greenedge-solutions.com | www.greenedge-solutions.com

  • August 13 · 33 min

    14: LTSA - Contract Without Obligations

    In episode fourteen of Best in BESS, I open up a real LTSA package from several large, globally recognized BESS suppliers and show exactly where the numbers disappear — clause by clause, including a real example of a supplier's written response to a request for clarification, which turns out to be its own lesson in reading contracts between the lines. I also talk about why supplier bankability has to be checked with the same rigor as round-trip efficiency, using real cases from the past year of well-financed suppliers that didn't survive to see their own guarantees tested — and why the order most investors follow when negotiating an LTSA is backwards from the one that actually protects them. Contact: contact@greenedge-solutions.com More at www.greenedge-solutions.com

  • July 26 · 36 min

    13: Owner's Engineer on BESS Project

    The market is speeding up. More tenders, more conversations, more investors who, after months of just watching the market, suddenly have a budget and want to move. And that's exactly when the first contract from a supplier or contractor lands — and you're right back at square one: vague clauses, responsibility spread across three parties, a warranty with no definition of what it actually covers. In episode thirteen of Best in BESS, I talk about the function that's supposed to prevent this before it ever happens — Owner's Engineer, understood not as a stamp in the site log, but as real engineering support across the entire life of the project. I walk through this in two stages: pre-investment support at the term sheet, specification, and contractor selection stage, and on-site support during final component selection, calculation verification, and physical presence during construction — with examples straight from Rova Systems' projects running across several European markets at once. Contact: contact@greenedge-solutions.com More at www.greenedge-solutions.com And www.rova.pl

  • July 5 · 29 min

    12: Ancillary Services: FCR, aFRR, mFRR

    FCR, aFRR, and mFRR are three different products — not three names for the same thing. Each one works differently, has different technical requirements, a different revenue profile, and a different risk structure. A surprising number of people in this industry use these three acronyms interchangeably. That's an expensive misunderstanding when you're building a financial model or negotiating an aggregator contract. In this episode I go through how each service works and at what timescale, what your system technically needs to qualify, why DUB certification is the foundation but not the full picture for FCR and aFRR, what realistic revenues look like for a 10 MW / 20 MWh project in Poland, and why your aggregator's balance sheet matters just as much as their algorithm. Questions or looking for support on a BESS project? contact@greenedge-solutions.com www.greenedge-solutions.com

  • June 21 · 31 min

    11: Entering the Balancing Market in Poland

    In this episode we walk you through everything that stands between a commissioned BESS project and its first revenue from ancillary services: the regulatory structure of the Polish balancing market, the hardware certification requirements that are entirely specific to Poland, the IT infrastructure PSE requires, and the DUB qualification process itself — including where projects consistently get stuck. The NC RfG certification and the PTPiREE approved hardware list are not details. They are prerequisites. If your inverter or PCS is not on the Polish white list, you will not receive grid connection conditions, you will not complete the execution design with the DSO, and you will not energize the project. Major international suppliers — companies that have been in this market for years — lose their place on that list because they didn't respond to documentation requests in time. This is the kind of thing that needs to be checked during supplier selection, not after the supply contract is signed. Questions or looking for support on a BESS project? contact@greenedge-solutions.com www.greenedge-solutions.com

  • June 7 · 27 min

    10: BESS Project Financing

    You can have the right location, a solid grid connection agreement, a credible supplier, and an experienced EPC on the shortlist. None of that matters if the financing doesn't close. And the reason it doesn't close is almost always the same: the investor structured the project without understanding what the bank actually needs to see. In this episode I go through BESS project financing from the bank's perspective first — how they think about risk, what DSCR means in practice for a storage project, and why the hybrid versus stand-alone distinction shapes everything that follows. Then I cover the three main commercial structures for optimizer cooperation, because that's where the bankability question usually gets resolved. And I close with two issues specific to the Polish market right now that every investor needs to have on their radar. The projects that move fastest through due diligence are the ones that were prepared for the questions before they were asked. Looking for support with BESS project financing, financial modelling, or commercial structuring in Poland? contact@greenedge-solutions.com www.greenedge-solutions.com

  • May 31 · 30 min

    09: The EPC Tender - Selecting the right Contractor

    You have your permits, your equipment order, and your grid connection agreement. Now you need someone to actually build the thing. And this is where a lot of projects go wrong — not because of bad technology or poor financing, but because of a contractor selection process that wasn't designed to find the right partner. In this episode I cover the full EPC procurement process from both sides of the table — I've run RFP processes as an investor advisor and prepared bids as a contractor representative. That dual perspective changes what I think actually matters here. In this episode: Three EPC delivery models — Full EPC, BoP, and Full Wrap with O&M — and what each one means for risk allocation and cost When to issue your RFP and how to structure the process in phases, from RFI to BAFO What a well-constructed tender document actually contains — and where most RFPs fail How many contractors to invite and why a wide-distribution tender produces worse outcomes The site visit — when to organise it and what it tells you about a contractor before you sign anything How to evaluate offers beyond price: track record, team, financial stability, contract posture Red flags on both sides — signals from contractors that something is wrong, and signals from investors that push the best contractors away How the Polish EPC market compares to Germany and the UK, and what that means for your procurement strategy The cheapest offer is very often the most expensive project. Looking for support with EPC procurement or owner's engineering in Poland? contact@greenedge-solutions.com www.greenedge-solutions.com

  • May 24 · 26 min

    08: NIS2 and Cybersecurity in BESS Project

    On the 19th of February 2026, Poland signed the amended Act on the National Cybersecurity System — the Polish implementation of the EU NIS2 Directive. For BESS investors and developers, this is not an IT compliance story. It's a project risk story, which affects you whether your entity is directly regulated or not. In this episode: why the energy sector — including battery storage — is explicitly covered by NIS2; how flow-down clauses mean NIS2 reaches your project even if you fall below the direct regulation threshold; what a BESS actually looks like as a cybersecurity target — the three system layers and four realistic attack vectors; what the Polish KSC Act requires from you and on what timeline; what to require from each party in your supply chain — BESS supplier, SCADA integrator, EPC contractor, O&M provider, and aggregator; what cybersecurity testing needs to happen before you sign off on commissioning and who should conduct it; which contract clauses lock this in; and why building security into a fifteen-year asset from day one is a fundamentally different calculation than treating it as an optional extra. Questions? Contact: contact@greenedge-solutions.com You can find our more at: www.greenedge-solutions.com

  • May 9 · 31 min

    07: SGU - Significant Grid User

    In September 2025, for the first time in Poland's history, battery energy storage systems were included on the SGU list — Significant Grid Users. If you are developing or financing a BESS project with a capacity of at least 10 MW and 40 MWh — this episode is for you. In this episode: what SGU is and where this obligation comes from; who ends up on the list and how that process works from the investor's and developer's side; what specific technical and operational obligations the SGU status imposes; why there is no compensation for being an SGU and what costs to expect; what grid following, grid forming, and black start mean — and why this decision should be made at the EPC specification stage; whether you can build an off-grid installation and what that means legally for a large BESS project; and why SGU, Poland's grid connection reform, and NIS2 together tell one story — BESS as critical grid infrastructure. Questions? Write to: contact@greenedge-solutions.com More: www.greenedge-solutions.com

  • May 2 · 26 min

    06: Choosing a BESS Supplier

    You've developed your project, secured the permits, and now you need to buy the system. And this is where a lot of investors — including experienced ones — discover they weren't as prepared as they thought. The BESS supplier market is crowded, opaque, and the differences between offers that look identical on paper can be enormous in practice. In this episode, I walk through how the supplier market actually works — cell manufacturers, system integrators, technology developers, and why the distinction matters. I cover the structural shift that's making life harder for smaller investors as top-tier suppliers chase volume, how to evaluate supplier credibility before you commit, what scope of supply you should actually be asking for, how to run a proper RFP and BAFO process, what certifications matter specifically for projects in Poland, and the red flags in offers and term sheets that tell you something is wrong before you've signed anything. e-mail: contact@greenedge-solution.com www.greenedge-solutions.com

  • April 25 · 27 min

    05: How to Develop a BESS Project in Poland

    Development is where most BESS projects succeed or fail — not on the construction site, but in the eighteen to twenty-four months before a single container arrives. In this episode, I walk you through the full development process for a utility-scale stand-alone project in Poland: site selection, land rights, zoning under the new General Plan regime, environmental decisions, grid connection under the new UC84 rules, building permits, cable route negotiations, and what RTB actually means versus how it's often marketed. UC84 changed the economics of early-stage development significantly — higher upfront deposits, new performance securities, shorter validity periods for connection conditions, and mandatory milestones in connection agreements. The Zoning Conditions system is being replaced by General Plans, which municipalities must adopt by end of August 2026. And cable pooling has finally been extended to battery storage, which opens real opportunities for PV retrofit projects. This episode also addresses the retroactivity provisions of UC84 and what they mean for anyone evaluating a project acquisition, and why remote development of Polish projects without local presence almost always ends in frustration. Questions or project enquiries: contact@greenedge-solutions.com

  • April 19 · 27 min

    04 - UC84 - Poland's New Grid Connection Rules

    On April 15, 2026, Poland published UC84 in the Journal of Laws — a comprehensive amendment to the Energy Law that fundamentally changes how grid connections work. The law enters into force on April 29, 2026. After almost a year of legislative work, numerous controversies, and Senate amendments, we have the final text. Time to explain what changed and what it means for BESS and renewable energy investors and developers. In this episode: grid connection conditions validity shortened from two years to one and what this means for the development process; three new financial instruments — application fee, doubled advance payment, and an entirely new security deposit — with specific amounts; milestones in connection agreements and the force majeure clauses the Senate introduced at the last moment; two new types of connection agreements — why flexible and configurable agreements are two completely different things and why banks won't finance your full capacity under the latter; cable pooling extended to energy storage — the change the market has been waiting for; and retroactivity — the most controversial element of the law and the specific compromise that ultimately made it into the final text. Questions? Contact: contact@greenedge-solutions.com

  • April 11 · 27 min

    03: C&I Energy Storage

    C&I storage is not just small cabinet systems — we're talking about containerized solutions of several megawatt-hours that can fundamentally change how your business operates, with payback periods of three to four years for energy-intensive facilities rather than the seven to eight years typical in utility-scale projects. This episode covers the Commercial & Industrial segment: energy storage at factories, logistics centers, cold storage facilities, and office buildings. Different economics than stand-alone trading assets, often faster development timelines, and systems that can operate for fifteen to twenty years because they're cycled less aggressively. In this episode: C&I scale: from small cabinets to multi-MWh containerized solutions Why C&I can achieve 3-4 year payback compared to 7-8 years for utility-scale Four applications: peak shaving, PV self-consumption, backup, power quality Battery vs diesel generator: response time, maintenance, flexibility How a C&I battery can generate revenue on weekends by providing grid services Sizing fundamentals: why 15-minute consumption data is essential Common calculation mistakes and how to avoid them What we're working on now: early-stage C&I projects, RFQ/RFP support This episode is for business owners and facility managers considering storage investments who want to understand whether it makes financial sense before committing capital. E-mail: contact@greenedge-solutions.com Website: www.greenedge-solutions.com

  • March 29 · 28 min

    02: What's Really Inside a BESS Container?

    From the outside, a battery container looks simple — just a box. But what's inside determines whether your investment performs for fifteen years or starts causing problems after two. In this episode, we open up the container and examine every critical component: battery cells and chemistry, BMS architecture, power conversion systems, cooling and heating (critical for Polish winters), fire safety, and energy management systems. In this episode: Key components inside a container RTE explained: the difference between marketing specs and real-world performance at the point of connection BMS: why the "brain" of your system might limit performance AC-block vs DC container: "plug and play" doesn’t exist Cooling ang heating and what happens when it's - 27°C A real life example: servicing a 5-year-old container with no manufacturer contact, fake SOH readings, and completely unbalanced cells The essential questions to ask suppliers before you commit This episode is for anyone evaluating battery storage investments who wants to understand what they're actually buying — beyond the marketing brochures. 📧 contact@greenedge-solutions.com

Showing 1–20 of 21 episodes