Skip to content
Artwork for Crashed
Crashed · May 21 · 49 min

HS2: How difficult is it to build a £100bn railway?

Britain’s next-generation high-speed rail network (HS2) was going to lay 530km of track, offer speeds of up to 225mph, cost around £33bn, and launch in 2026, when it was announced in 2012. Now in 2026, it’ll cost up to £103bn, be under half the length (225km), slower, and won’t be completed until, potentially, 2043. It’s gone laughably wrong. Even the government calls it “the world’s most expensive slow-motion car crash”. Presenters Alex Hudson and Chris Stokel-Walker interview transport expert Adam Tyndall about how a slow-motion car crash is possible on a railway, exactly what’s gone wrong and why a bat tunnel costs £100m (yes, it does relate to HS2). Elsewhere, how much EU can an EU EU if an EU is in the EU? Brussels is preparing the Chips Act 2.0 for a reported launch on 27 May, as part of the wider Tech Sovereignty Package. They want to double Europe’s global semiconductor market share to 20% by 2030. Chris is heading to Europe to find out if that’s possible (though we both think we know the answer). Follow Adam on LinkedIn: https://www.linkedin.com/in/adamtyndall/ To support, go to https://bit.ly/CrashedPodcast or search Crashed podcast Follow: Alex: www.instagram.com/alexhuds / www.tiktok.com/@alexhuds Chris: www.instagram.com/cstokelwalker / www.tiktok.com/@st0kel Spotify: https://bit.ly/CrashedSpotify Apple Podcasts: https://apple.co/4qkgmmV RSS: https://bit.ly/CrashedRSS Hosted on Acast. See acast.com/privacy for more information.

0:00-49:41

transcript

No transcript — this publisher did not publish one.

show notes

Britain’s next-generation high-speed rail network (HS2) was going to lay 530km of track, offer speeds of up to 225mph, cost around £33bn, and launch in 2026, when it was announced in 2012. 


Now in 2026, it’ll cost up to £103bn, be under half the length (225km), slower, and won’t be completed until, potentially, 2043. 


It’s gone laughably wrong. Even the government calls it “the world’s most expensive slow-motion car crash”. 


Presenters Alex Hudson and Chris Stokel-Walker interview transport expert Adam Tyndall about how a slow-motion car crash is possible on a railway, exactly what’s gone wrong and why a bat tunnel costs £100m (yes, it does relate to HS2).


Elsewhere, how much EU can an EU EU if an EU is in the EU? Brussels is preparing the Chips Act 2.0 for a reported launch on 27 May, as part of the wider Tech Sovereignty Package. They want to double Europe’s global semiconductor market share to 20% by 2030. 


Chris is heading to Europe to find out if that’s possible (though we both think we know the answer).


Follow Adam on LinkedIn: https://www.linkedin.com/in/adamtyndall/

To support, go to https://bit.ly/CrashedPodcast or search Crashed podcast


Follow:

Alex: www.instagram.com/alexhuds / www.tiktok.com/@alexhuds

Chris: www.instagram.com/cstokelwalker / www.tiktok.com/@st0kel


Spotify: https://bit.ly/CrashedSpotify

Apple Podcasts: https://apple.co/4qkgmmV

RSS: https://bit.ly/CrashedRSS


Hosted on Acast. See acast.com/privacy for more information.

links8