Skip to content
Artwork for Bench Boost by Inorganic Ventures
Bench Boost by Inorganic Ventures · July 8 · 8 min

CCVs & ICVs

Send us Fan Mail This week on Bench Boost Mike explains two key ICP-OES/ICP-MS quality control samples: the Initial Calibration Verification (ICV) and Continuing Calibration Verification (CCV). The ICV is run after calibration and before samples to confirm the calibration worked. The CCV is run periodically during the batch to confirm the calibration remains valid as drift, clogging, cone buildup, washout, or other issues occur. This episode concludes with reviewing how to troubleshoot ICV or CCV failures.

0:00-8:53

transcript

No transcript — this publisher did not publish one.

show notes

Send us Fan Mail

This week on Bench Boost Mike explains two key ICP-OES/ICP-MS quality control samples: the Initial Calibration Verification (ICV) and Continuing Calibration Verification (CCV). The ICV is run after calibration and before samples to confirm the calibration worked. The CCV is run periodically during the batch to confirm the calibration remains valid as drift, clogging, cone buildup, washout, or other issues occur. This episode concludes with reviewing how to troubleshoot ICV or CCV failures. 

links1