Skip to content
video episode
0:00 / 0:49
Adapt 2030 · August 31 · 49 sec

4–6 Million m³ Backing Up!

💧PerformLyte Hydration that Gets In https://vni.life/daviddubyne.performlyte💧 Three more water-packed ice dams are forming upstream; overflow can’t keep up, and the lakes are already backing up. If they merge into about 4–6 million cubic meters, the same valleys are expected to take Wave 2.

Transcript file

transcript

No transcript — this publisher did not publish one.

show notes

💧PerformLyte Hydration that Gets In https://vni.life/daviddubyne.performlyte💧
Three more water-packed ice dams are forming upstream; overflow can’t keep up, and the lakes are already backing up. If they merge into about 4–6 million cubic meters, the same valleys are expected to take Wave 2.

links1